BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Miami, Florida. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of July 8, 2024, an engineer has been selected. A PD&E study is currently in progress. The anticipated contractor bidding will occur in 2030 and construction is anticipated to occur in 2030. *The closed solicitation has been included below for reference: Selection Method : Letter of Response and Interview Professional Liability Insurance : $250,000.00 Financial Management Numbers : 43807613201 SR 9/NW 27 Ave from Miami Intermodal Center to NW 215th ST TRC Members (Subject to Change) : Dionne Richardson Felix Hernandez Nilia Cartaya SR 9/NW 27 Ave from Miami Intermodal Center to NW 215th Street Unity Station Premium Transit Services (PTC) Study. SR 9/NW 27th Avenue (North Corridor) Engineering Consultant Services The Florida Department of Transportation (Department) requires professional services of an Engineering Consultant (Consultant) for a wide range of engineering, premium transit, survey, architectural, landscaping, technical, management and administrative services as needed to assist in executing and reviewing projects along SR 9/NW 27 Avenue (North Corridor) from the Miami Intermodal Center (MIC) to NW 215th Street. The Consultant will primarily support the District Six Modal Development Office (MDO). The Consultant will supplement the Department's resources by providing highly qualified technical and professional personnel to perform the duties assigned under the terms of this agreement on an as needed basis through the issuance of a Task Work Order for the required work. Longlist Date/Time 11/22/2022 Shortlist Selection Date/Time 11/28/2022 Phase II Submittal Deadline Date/Time 12/14/2022 Consultant Interviews Date/Time 12/15/2022 Final Selection Date/Time 1/09/2023 Negotiations Period Begin Date 1/17/2023 Negotiations Period Ending Date 3/01/2023 The method of Contractor Selection has not been Determined at this time. FLDOT - RFP Engineering - SR 9/NW 27 Ave from Miami Intermodal Center to NW 215th ST

Design

Roads / Highways

$2,200,000,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
47
Bidding Soon
1,085
All Active Projects
486
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.