Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 8, 2024 at 8:00 PM
Updated July 9, 2024
Site work and paving for a road / highway in Miami, Florida. Design plans call for site work for a road / highway; and for paving for a road / highway.
As of July 8, 2024, an engineer has been selected. A PD&E study is currently in progress. The anticipated contractor bidding will occur in 2030 and construction is anticipated to occur in 2030. *The closed solicitation has been included below for reference: Selection Method : Letter of Response and Interview Professional Liability Insurance : $250,000.00 Financial Management Numbers : 43807613201 SR 9/NW 27 Ave from Miami Intermodal Center to NW 215th ST TRC Members (Subject to Change) : Dionne Richardson Felix Hernandez Nilia Cartaya SR 9/NW 27 Ave from Miami Intermodal Center to NW 215th Street Unity Station Premium Transit Services (PTC) Study. SR 9/NW 27th Avenue (North Corridor) Engineering Consultant Services The Florida Department of Transportation (Department) requires professional services of an Engineering Consultant (Consultant) for a wide range of engineering, premium transit, survey, architectural, landscaping, technical, management and administrative services as needed to assist in executing and reviewing projects along SR 9/NW 27 Avenue (North Corridor) from the Miami Intermodal Center (MIC) to NW 215th Street. The Consultant will primarily support the District Six Modal Development Office (MDO). The Consultant will supplement the Department's resources by providing highly qualified technical and professional personnel to perform the duties assigned under the terms of this agreement on an as needed basis through the issuance of a Task Work Order for the required work. Longlist Date/Time 11/22/2022 Shortlist Selection Date/Time 11/28/2022 Phase II Submittal Deadline Date/Time 12/14/2022 Consultant Interviews Date/Time 12/15/2022 Final Selection Date/Time 1/09/2023 Negotiations Period Begin Date 1/17/2023 Negotiations Period Ending Date 3/01/2023 The method of Contractor Selection has not been Determined at this time. FLDOT - RFP Engineering - SR 9/NW 27 Ave from Miami Intermodal Center to NW 215th ST
Design
Roads / Highways
$2,200,000,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 7, 2030
FL-9, Miami, FL
Related To This Project
Miami, FL
Bid Date: Nov 30 2022
Miami, FL
Bid Date: Dec 14 2022
Miami, FL
Bid Date: Sep 28 2022
Miami, FL
Bid Date: Sep 16 2022
Miami, FL
Bid Date: Nov 17 2022
Miami, FL
--
Miami, FL
--
Miami, FL
--
Miami, FL
--
Miami, FL
--
Miami, FL
--
Miami, FL
--
Miami, FL
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
