Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a playground / park / athletic field in Boca Raton, Florida. Completed plans call for the renovation of a playground / park / athletic field.
SSP Community Center Roof Replacement The work will occur on the community center located within Sugar Sand Park, 300 S. Military Trail, Boca Raton, Florida. The project consists of replacing the entire roof and, in the process, transitioning the tile roof system portion to a metal standing seam roof. We are not requiring a bid bond but do require performance and payment bonds in the amount equal to 100% of the bid amount. In addition, insurance requirements are outlined in the bid documents. The selected contractor will need to meet these insurance requirements so please be sure to review them and make sure you are willing to obtain the required insurance and bonds. Also note that we understand lead times for roofing materials are substantial right now. We are prepared for that this is not an emergency replacement but a preventative maintenance replacement. Please note this portion of the bid documents: Contractors shall present a proposed work schedule as part of the bid packet. The timeline should identify the timeframe from physical work beginning until completion (beginning and end dates are not critical with the bid packet but a timeline showing the amount of time each part of the work will take is required). When a fully signed contract between the contractor and District is executed and proof of insurance and bonds are presented to the district, a preliminary Notice to Proceed will be granted. With the preliminary Notice to Proceed, the contractor may begin the permitting process and ordering of any material, supplies or equipment that will be needed. Physical site work may not begin until city permits are obtained, a Notice of Commencement is filed with Palm Beach County and a Notice to Proceed is issued by the district. Once permits are received and materials are ordered the contractor will need to provide a timeline with start and end dates for the physical project.
Award
Playgrounds / Parks / Athletic Fields
$1,639,586.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 2, 2022
December 14, 2022
300 S Military Trail, Boca Raton, FL
Related To This Project
Boca Raton, FL
Bid Date: May 14 2021
Boca Raton, FL
--
Boca Raton, FL
--
Boca Raton, FL
--
Boca Raton, FL
--
Boca Raton, FL
--
Boca Raton, FL
Bid Date: Dec 09 2022
Boca Raton, FL
--
Boca Raton, FL
--
Boca Raton, FL
Bid Date: Nov 04 2022
Boca Raton, FL
--
Boca Raton, FL
--
Boca Raton, FL
--
Boca Raton, FL
Bid Date: Jun 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.