Published December 21, 2022 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Dexter, Maine. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

**As of December 21, 2022 , this project has not yet been awarded. The project is expected to be awarded on February 2022.** 3-23-0016-TBD-2023, 22-0127, 22-013, ATP No. 3-23-0016-TBD-2023 & AIP No. 3-23-0016-TBD-2023 The proposed work may include but is not necessarily limited to: The demolition of an existing hangar, the construction of a new terminal building including foundation and site work, a septic system, a well and water line, reconstruction of the airport accessroad, construction of a parking lot, providing security fencing and gates, airside taxilane and apron reconstruction and expansion, aircraft tie down anchors, and ancillary work. All Requestsfor Information (RFIs) must be submitted no later than Wednesday, November 16, 2022 to the Engineer, using airport.bids@stantec.com email address. Bid security in the amount of at least five percent (5%) of the total bid must be submitted with the Bid. The bid security may be either a certified check or a proposal guaranty bond executed by a surety company authorized to do business in the State of Maine. Bid security shall be made payable to the Town of Dexter. Late bids, unsigned bids, faxed bids, or bids submitted without security will not be considered. The successful bidder must furnish a 100 percent Performance Bond, and a 100 percent Labor and Materials Payment Bond, and begin execution of this contract within five (5) calendar days following the Notice to Proceed. Construction under this contract will be funded by Federal Grant under the Airport Terminal Program (ATP) and the Airport Improvement Program (AIP) and will be subject to all applicable requirements of the U.S. Department of Transportation / Federal Aviation Administration and the Maine Department of Transportation. Award of all contracts will be contingent upon receipt of Federal funding under ATP & AIP. The Town of Dexter, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Goals for minority participation for each trade: 0.5% Goals for female participation in each trade: 6.9% The Town of Dexter reserves the right to reject any and all proposals, to waive any technical or legal deficiencies, and to accept any bid that it may deem to be in the best interest of the Town of Dexter and the Dexter Regional Airpor Bid Result BID SCHEDULE No. 1 - TERMINAL BUILDING - DP Porter Contractors - $985,612.30 BID SCHEDULE No. 2 - ACCESS ROAD - Gordon Contracting - $130,010.00 BID SCHEDULE No. 3 - PARKING LOT - Gordon Contracting - $108,305.00 BID SCHEDULE No. 4 - AIRSIDE IMPROVEMENTS - Benchmark - $238,375.00

Bid Results

Transportation Terminals

$1,462,302.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Contractor Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Vehicular Access and Parking, Haul Routes, Execution and Closeout Requirements, Examination and Preparation, Acceptance of Conditions, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber, Sheathing, Shop-Fabricated Structural Wood, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Steep Slope Roofing, Shingles and Shakes, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows, Plastic Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Other Specialties, Flags and Banners, Flags
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furnishings and Accessories, Portable Lamps, Lamps
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Instrumentation and Control Devices for HVAC, Electric and Electronic Control System for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Distribution Equipment, Wiring Devices, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts, Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
17
Bidding Soon
210
All Active Projects
93
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2022

April 15, 2023

img_map_placeholder

23 Main St, Dexter, ME

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Construct Terminal Building & Mise. Airport Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.