Site work and paving for a mixed-use development in Toledo, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project will reclaim .76 miles of Swan Creek Drive along with Crosshaven Lane and Christopher Court, from Cheyenne Boulevard to Brownstone Boulevard. This includes reclaiming the pavement, installing handicap ramps. Also include in the project will be replacing 4340 feet of 8-inch diameter water main on Cresthaven Lane from Cheyenne Blvd to Brownstone Blvd. This project improves .30 miles of Larchwood Lane and Larchwood dead end, From Cresthaven Lane to Cresthaven Lane through removing the existing wearing course, performing necessary pavement repairs, resurfacing. Also include in the project will replace 1260 feet of 6-inch diameter water main with 8-inch water main on Larchwood Lane from Cresthaven Lane to Cresthaven Lane. This project will reclaim .10 miles of Swan Creek Lane, from 250' east of Whitechapel Drive to Cresthaven Lane. This includes reclaiming the pavement, installing sidewalk on the south side and handicap ramps. City forms must be filled out and attached to the bid: Acknowledgment and Acceptance of Conditions Contract Specifications; Toledo Municipal Income Tax Compliance; Public Utilities Compliance; MBE Good Faith and Goal Commitment; EEO Form; Suspension and Debarment; Primary and Subcontractor Forms; Best Bid Criteria; Signed Contract by Vendor CEO/President ; MBE Participation form; Certificates of Insurance; Current Worker's Compensation Certificate; Court-Ordered Child Support Affidavit; Independent Contractor PERS forms; and additional Insurance as Required. Prevailing Wages are required for this project Q&A Deadline 11/01/2022 2:00 PM (EDT) Pre-Bid Meeting No Bid Bond 5.00% Payment Bond 0.00% Performance Bond 100.00% Project Duration 145 Days Bid Valid 90 days Project Type Bid Response Types Line Items Bid Bond Construction Project Paperwork (required) Signed Contract (required) Child Support Affidavits (required) Insurance Certificate (required) Bureau of Workers Comp Certificate (required) Tax Exempt Certificate (required) Additional Upload, if necessary Additional Upload, if necessary Additional Upload, if necessary Type of Award Lump Sum

Bid Results

Roads / Highways

$1,637,624.00

Public - City

Paving, Site Work

80

8

2

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
88
Bidding Soon
1,351
All Active Projects
562
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2022

December 8, 2022

img_map_placeholder

Multiple Locations, Toledo, OH

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.