BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 20, 2023 at 7:00 PM

Updated January 25, 2024

Site work for a water / sewer project in Saltillo, Mississippi. Completed plans call for site work for a water / sewer project.

Furnishing of all labor and materials and for the construction of the certain Project designated as the "AMR WATER METER SYS- TEM EQUIPMENT" project with Contract Documents and Specifica- tions being on file at the same location. Bids are related to the construction required for the development and installation of new equipment to supply the necessary equipement in order to provide an Automated Meter Reading (AMR) system for the City of Saltillo Water Department and the inte- gration of the system components with the City's water metering & billing systems. The project will in- clude provding the necessary equipment to facilitate a fully functional AMR System for the reading of the City's water meters. Instal- lation will be by others; the Con- tractor will not be required to install the equipment, materials, etc. The Contractor shall coordi- nate between the manufacturer, equipment distributor and the Owner for coordination and inte- gration of of the AMR system into the City of Saltillo billing system, including any necessary training of field and office personnel, etc. as required for final field integration of the AMR system. The proposal and contract documents in its entirety shall be submitted in a sealed envelope and deposited to the Office of City Clerk located in City Hall, 395 Mobile St., Saltillo, MS 38866, prior to the hour and date above designated. No stripped bids will be accepted. Award will be made to the lowest and best bidder and the Mayor and Board of Aldermen reserve the right to reject any and all bids and to waive any and all informalities.

Post-Bid

Water / Sewer

$573,000.00

Public - City

Site Work

9

2

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Testing Laboratory Services, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Project Record Documents
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Excavation and Fill, Fill
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
24
Bidding Soon
322
All Active Projects
161
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2023

February 20, 2023

img_map_placeholder

Multiple Locations, Saltillo, MS


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.