BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Garland, Texas. Completed plans call for site work for a water / sewer project.

RFB Request for Bid A sealed written request made to prospective suppliers requesting submission of a bid for goods or services. All questions must be answered in the Ion Wave Question & Answer segment. No emailed, faxed or phone call question related to this bid will be responded to. The deadline for submitting questions on this bid is November 07, 2022 at 5:00pm. A Bid Bond in the amount of 5% is required with your bid response. CASHIER CHECKS ARE NOT ACCEPTED IN LEUI OF A BID BOND. A Performance, Payment and Maintenance Bond will be required upon notification of award. Please acknowledge the City of Garland Terms and Conditions in the "Attributes" section. First Street From Chico Drive (N) Alley to Tulip Drive (S) Alley Wastewater Improvements (Alley north of E Chico Drive, Alley between E Chico Drive and Marigold Drive, Alley between Marigold Drive and Sunflower Drive, Alley between Sunflower Drive and Tulip Drive, Alley between Gardenia Drive and Honeysuckle Drive, Alley between Honeysuckle Drive and Donald Drive, and along S 1st Street) This project is within the residential area east of S 1st Street and west of Broadway Boulevard. Proposed wastewater replacement limits are east of S 1st Street, north of Tulip Dr, and within existing alleys described as: Alley north of E Chico Drive, Alley between E Chico Drive and Marigold Drive, Alley between Marigold Drive and Sunflower Drive, Alley between Sunflower Drive and Tulip Drive, Alley between Gardenia Drive and Honeysuckle Drive, Alley between Honeysuckle Drive and Donald Drive, and along S 1st Street. All portions of the project are located within the corporate limits of Garland, Texas. The project includes design of approximately 5,690 linear feet of 8" wastewater main replacement by open cut, including manholes and service laterals. The project also includes approximately 1,340 square yards 6- inch concrete alley paving replacement, 850 square yards of street, driveway, and sidewalk replacements, and 3,620 square yards of gravel alley replacements. The wastewater mains are primarily located east of S 1st Street, north of Tulip Dr, and within existing alleys described as: Alley north of E Chico Drive, Alley between E Chico Drive and Marigold Drive, Alley between Marigold Drive and Sunflower Drive, Alley between Sunflower Drive and Tulip Drive, Alley between Gardenia Drive and Honeysuckle Drive, Alley between Honeysuckle Drive and Donald Drive, and along S 1st Street. WA37-2022

Bid Results

Water / Sewer

$1,428,832.00

Public - City

Site Work

47

13

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
66
Bidding Soon
3,557
All Active Projects
1,409
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.