BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 22, 2025 at 8:00 PM

Updated April 23, 2025

Site work and new construction of an educational facility in Toronto, Ontario. Working plans call for the construction of a 122,515-square-foot, three-story above grade educational facility; and for site work for a educational facility.

Seneca intends to redevelop the eastern end of Newnham Campus (1750 Finch Avenue East) to create a 3-storey building; total GFA of approx.11,588 sq m. The new facility will replace the aging gymnasium and fitness facilities, including our decommissioned arena, to create the new Health & Wellness Centre. Bringing together programming to maintain and improve all aspects of wellness for the entire Seneca community, the centre will address not just physical wellness, but mental, physical, and spiritual health as well. This project will also expand our existing efforts towards demonstrating best practices for sustainable buildings/development. TIMELINE: Designs are ongoing. Owner is awaiting site plan approvals from the city of Toronto. Construction timelines will be finalized pending approvals as well as owner's decision to proceed. Further update fall 2025.

Pre-Construction/Negotiated

Educational

$35,500,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
483
Active Projects
198
Bidding Soon
4,861
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2023

September 15, 2025

Project location map

1750 Finch Ave E, Toronto, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.