BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Buckeye, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project is located in the City of Buckeye. The limits of improvements are from Miller Road from Lower Buckeye Road to Pima Street and Lower Buckeye Road from 1,000 feet West of Miller Road to 1,200 feet East of Miller Road. The work consists of constructing grading for new roadway alignment and profile, pavement, curb, gutter, drainage, street lighting, new traffic signal at Miller Road and Lower Buckeye Road and accompanying power service, signing, pavement marking, APS overhead relocations, signal interconnect conduit, and sewer stubs as shown in the project plans Exhibit C. City of Buckeye, Miller Road from Lower Buckeye Road to Pima Street and Lower Buckeye Road from 1,000 ft west of Miller Road to 1,200 ft East of Miller Road. The Construction Budget is: $11,500,000.00. The Bidder is required to email and then submit through mail a certified or cashier's check, upon a solvent bank, or a surety bond in an amount equal to ten percent (10%) of the Base Bid made payable to the City of Buckeye. The bid security shall be given as a guarantee that the Bidder will enter into the Contract if awarded to him; and shall be declared forfeited as liquidated damages if he refuses to enter into said contract upon request to do so by the City. All bids must also include a list of subcontractors being proposed for this project. A Subcontractor List is attached hereto as Attachment 2. The Contractor to whom the Contract is awarded shall, after being awarded the Contract, furnish to the City with a fully executed Contract a satisfactory performance and payment bond in an amount equal to one hundred percent (100%) of the full amount of the Bid, such bond not to be expressly limited as to time in which action may be instituted against the surety company for possible nonperformance of the Contractor. Work shall commence immediately after the issuance of the Notice to Proceed and shall be completed within Two Hundred Seventy-Five (275) calendar days from the date established by such notice. Subject to the provisions of the City's Procurement Code, the City reserves the right to reject any or all Bids, to waive or decline to waive irregularities in any bid, or to withhold the award if the City determines it to be in the best interests of the City. Time is of the essence for the Work under the Contract. The Bidder shall note that the Work must be completed within Two Hundred Seventy-Five (275) calendar days, and that failure to do so will result in the deduction of One Thousand Seven Hundred Eighty Dollars and Zero Cents ($1,780.00) for each and every calendar day that the Work shall remain uncompleted after the time specified for the completion of the Work, as liquidated damages and not as a penalty. Question Deadline 05/24/2024 at 3:00 PM MT Last Day for Questions Diana Landeros, dlanderos@buckeyeaz.gov *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Award

Roads / Highways

$11,500,000.00

Public - City

Outdoor Lighting, Paving, Site Work

137

10

12

4

Subscribe For Documents

87 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
22
Bidding Soon
690
All Active Projects
270
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2024

August 13, 2024

img_map_placeholder

S Miller Rd, Buckeye, AZ

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.