BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction and renovation of an educational facility in San Diego, California. Completed plans call for the construction of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Gompers Prep Academy Whole Site Modernization (Lease-Leaseback) 2 new buildings, building repairs, new building systems, and site improvements. Existing building improvements include new interior finishes, modernization, and toilet renovations. New building systems include a public address system, fire alarm system, and enhancement of structural system. Site improvements include a new quad, fencing upgrades, and new landscaping along the main-entry street frontage. The intent of the project is to build a new two-story instructional building (Bldg 20), a new lecture building, modernize Building 9, and create a new quad and exterior spaces. The existing bungalows (19) will be demolished in phases during the construction of the new classroom and lecture buildings. Note that the above description is for major scope elements and is not a comprehensive list of every element in the project Type of Award Lump Sum Bid Bond 0.00% Payment Bond 0.00% Submit RFI's via email to Mary Homan at mchoman@sundt.com no later than November 10 th at 4:00 PM. Final addendum including RFI responses will be issued on Nov. 28 th . Performance Bond 0.00% Online Q&A No Each bid shall be in accordance with all terms, conditions, plans, specifications and any other documents that comprise the bid documents. The DSA approved plans and specifications, appendices, and forms will be posted and maintained through electronically (only add date if after advertisement). Please email Lamia Porter at LNPorter@sundt.com including Company Name, Company Address, CA License #, Company Website/PDF Brochure, Main Contact Person, and Bid Package Numbers interested in Bidding. Prevailing wage requirements apply to all public works projects and must be followed per Article 17 of the General Conditions of the Request for Proposals. The applicable prevailing wage determination during construction is the one in effect on the date the GMP is first published in a newspaper of general circulation. Here, the applicable prevailing wage determination for construction services referenced in the published GMP advertisement is 2022-2. The first bid advertisement date for each District defined GMP phase shall establish the applicable prevailing wage determination, regardless of how many times the Prime Contractor published an advertisement. That first bid advertisement to subcontractors shall state the applicable prevailing wage determination for construction services for the duration of that District defined GMP phase. Each District defined GMP phase for construction services may have a different prevailing wage determination based on its separate publication of the first bid advertisement date. Pursuant to resolution in support of Service-Disabled Veterans Owned Businesses (SDVOB) and Disabled Veteran Business Enterprises (DVBE) approved on May 10, 2011 by the Board of Education, Sundt Construction Inc. is required to satisfy a minimum DVBE participation percentage of at least three percent (3%) for this project. In compliance with this program, the bidder shall satisfy all requirements enumerated in the bid package. GOALS FOR EBE & DVBE PARTICIPATION: 50% EBE / 6% DVBE This project is being bid as "Bid Packages". Bidders will have the option to bid multiple bid packages; however, the bidder must selfperform a minimum of 15% of each bid package that is being bid. A bidder interested in bidding multiple bid packages must also submit individual bids for each bid package and then provide bids with multiple bid packages combined. Example, if a bidder is interested in bidding the BP 22A Plumbing AND BP 23A HVAC combined (for a lower bid overall price than if each package were submitted separately), then the bidder would submit one bid form noting both bid package numbers and the combined amount on the bid form document. Note, the bidder MUST still submit a bid for each package individually in addition to the combined bid. The general contractor reserves the right to award bid packages as a combination or as a single package. Subcontracts shall be awarded, if awarded at all, by the general contractor on a best value basis. Bids will be reviewed and evaluated for completeness of scope coverage and awarded to the subcontractor who is deemed the best value for the project as a whole. BID PACKAGES ARE AS FOLLOWS. It is required that bidders possess any of the following classification(s) of California State Contractors License(s) (or other appropriate license, subject to District approval), valid and in good standing, at the time of bid opening and contract award. The general contractor reserves the right to award bid packages as a combination or as a single package. The District reserves the right to reject any and all bids and to waive any irregularities or informalities in any bids or in the bidding process. No bidder may withdraw his bid for a period of 120 days after the date set for the opening of bids

Post-Bid

Educational

$32,000,000.00

Public - City

New Construction, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

63 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
54
Bidding Soon
722
All Active Projects
330
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2022

March 1, 2023

img_map_placeholder

1005 47th St, San Diego, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.