Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a laboratory facility in Pearl, Mississippi. Completed plans call for the renovation of a laboratory facility.
The Bid Security shall be in the form of a Bid Bond, or a Certified Check: A. Bid Bond: The Bidder may submit a Bid Bond by a Surety licen sed in Mississippi in the amount of five percent (5 %) of the base bid . C ertified Check: The Bidder may submit a certified check made out to the Bureau of Building, Grounds and Real Property Management in the amount of five percent (5%) of the base bid. All checks received from Bidders will b e r eturned upon request, unless a Bidder is one (1) of the three (3) apparent low Bidders. The three (3) apparent low Bidder's checks will be held for forty - five (45) days, unless a Contract is awarded and execute d in less time. Where bid is to be submitted electronically, certified check must be physically delivered to the address indicated on the Advertisement for Bids prior to the time and date stated Questions should be directed to the Professional. The Owner reserves the right to reject any or all bids. Building envelope repairs. Seal attic; seal soffits, ridge vents, and other roof/wall openings. Applying liquid applied moisture barrier. Remediate mold/mildew behind laboratory casework. Seal existing floor penetrations. Replace ceiling tiles. Install new insulation above ceilings. Replace AHU-1 and associated VFDs, piping, ductwork, electrical service, controls, etc. Replace B-1 and associated piping, pump, electrical service, controls, etc. Replace CHW pumps. Replace VAV terminal units and add two new VAV terminal units. Replace VAV terminal unit HW control valves. Provide and install temporary controls on the existing (17) VAV terminal units to provide temporary heating until new boxes and controls are installed. This work shall take place as soon as possible once Contractor gets their Notice to Proceed (NTP). Install new exhaust fan, ductwork, louvers, controls, etc. for crawlspace ventilation. Replace exterior duct work on all existing supply, return, and outdoor air ductwork. Install new controls as specified. Install controls on other existing equipment, split-systems, etc. Testing, Adjusting, and Balancing of all new and existing HVAC systems in the Laboratory Building. Building shall be balanced to a positive pressure of 0.05 in. w.c. Modify electrical service to equipment replaced under this contract. Power to new equipment, VAV terminal units and exhaust fan. Replace lights where indicated. The existing vacuum pump in the main mechanical room shall be disconnected, removed, and reinstalled/reconnected in order to remove the existing boiler and install the new boiler. Additionally, any existing, piping, electrical, controls, etc. required to be removed in order to demo the existing boiler and install the new shall be included in Contractor's bid. The maximum outage duration for the replacement of AHU-1 shall be 14 calendar days. Completion- 360 calendar days 1. replace chilled water pumps (chp-1, chp-2) and reconnect to existing electrical. 2. replace existing hot water boiler. provide new 3-way hot water reset valve. install new hwp-3 boiler pump. 3. replace existing vav terminal units with new ddc controls and add (2) new vav boxes to condition and pressurize attic. replace vav terminal unit hw control valves. 4. remove and install new ddc controls for new equipment. integrate into existing emcs. 5. replace ahu-1. provide new vfd's, controls, electrical, etc. 6. replace ductwork insulation on all existing supply, return, outdoor, and exhaust air ducts. 7. replace chs/chr and hws/hwr piping insulation exposed within the main mechanical room. 8. install new crawlspace ventilation system. 9. provide testing, adjusting, and balancing for new hvac and existing laboratory hvac systems. balance hvac systems such that the building pressure is approximately +0.05 in. w.c. 10. electrical and lighting system modifications. 11. building envelope modifications including sealing attic and other envelope openings.
Post-Bid
Laboratories
$600,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 10, 2022
December 12, 2022
To Be Determined, Pearl, MS
Related To This Project
Pearl, MS
Bid Date: Apr 20 2022
Pearl, MS
Bid Date: May 04 2022
Pearl, MS
--
Pearl, MS
Bid Date: May 09 2022
Pearl, MS
Bid Date: May 10 2022
Pearl, MS
Bid Date: May 17 2022
Pearl, MS
Bid Date: Nov 08 2022
Pearl, MS
Bid Date: Oct 21 2022
Pearl, MS
Bid Date: Oct 20 2022
SCSD ESSER Package 6 Renovations to the River Road Building Taylorsville Elementary School - 4886681
Raleigh, MS
Bid Date: Feb 02 2023
Pascagoula, MS
Bid Date: Sep 27 2022
Southaven, MS
Bid Date: Nov 01 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.