BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a laboratory facility in Pearl, Mississippi. Completed plans call for the renovation of a laboratory facility.

The Bid Security shall be in the form of a Bid Bond, or a Certified Check: A. Bid Bond: The Bidder may submit a Bid Bond by a Surety licen sed in Mississippi in the amount of five percent (5 %) of the base bid . C ertified Check: The Bidder may submit a certified check made out to the Bureau of Building, Grounds and Real Property Management in the amount of five percent (5%) of the base bid. All checks received from Bidders will b e r eturned upon request, unless a Bidder is one (1) of the three (3) apparent low Bidders. The three (3) apparent low Bidder's checks will be held for forty - five (45) days, unless a Contract is awarded and execute d in less time. Where bid is to be submitted electronically, certified check must be physically delivered to the address indicated on the Advertisement for Bids prior to the time and date stated Questions should be directed to the Professional. The Owner reserves the right to reject any or all bids. Building envelope repairs. Seal attic; seal soffits, ridge vents, and other roof/wall openings. Applying liquid applied moisture barrier. Remediate mold/mildew behind laboratory casework. Seal existing floor penetrations. Replace ceiling tiles. Install new insulation above ceilings. Replace AHU-1 and associated VFDs, piping, ductwork, electrical service, controls, etc. Replace B-1 and associated piping, pump, electrical service, controls, etc. Replace CHW pumps. Replace VAV terminal units and add two new VAV terminal units. Replace VAV terminal unit HW control valves. Provide and install temporary controls on the existing (17) VAV terminal units to provide temporary heating until new boxes and controls are installed. This work shall take place as soon as possible once Contractor gets their Notice to Proceed (NTP). Install new exhaust fan, ductwork, louvers, controls, etc. for crawlspace ventilation. Replace exterior duct work on all existing supply, return, and outdoor air ductwork. Install new controls as specified. Install controls on other existing equipment, split-systems, etc. Testing, Adjusting, and Balancing of all new and existing HVAC systems in the Laboratory Building. Building shall be balanced to a positive pressure of 0.05 in. w.c. Modify electrical service to equipment replaced under this contract. Power to new equipment, VAV terminal units and exhaust fan. Replace lights where indicated. The existing vacuum pump in the main mechanical room shall be disconnected, removed, and reinstalled/reconnected in order to remove the existing boiler and install the new boiler. Additionally, any existing, piping, electrical, controls, etc. required to be removed in order to demo the existing boiler and install the new shall be included in Contractor's bid. The maximum outage duration for the replacement of AHU-1 shall be 14 calendar days. Completion- 360 calendar days 1. replace chilled water pumps (chp-1, chp-2) and reconnect to existing electrical. 2. replace existing hot water boiler. provide new 3-way hot water reset valve. install new hwp-3 boiler pump. 3. replace existing vav terminal units with new ddc controls and add (2) new vav boxes to condition and pressurize attic. replace vav terminal unit hw control valves. 4. remove and install new ddc controls for new equipment. integrate into existing emcs. 5. replace ahu-1. provide new vfd's, controls, electrical, etc. 6. replace ductwork insulation on all existing supply, return, outdoor, and exhaust air ducts. 7. replace chs/chr and hws/hwr piping insulation exposed within the main mechanical room. 8. install new crawlspace ventilation system. 9. provide testing, adjusting, and balancing for new hvac and existing laboratory hvac systems. balance hvac systems such that the building pressure is approximately +0.05 in. w.c. 10. electrical and lighting system modifications. 11. building envelope modifications including sealing attic and other envelope openings.

Post-Bid

Laboratories

$600,000.00

Public - State/Provincial

Renovation

29

17

10

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
24
Bidding Soon
238
All Active Projects
106
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2022

December 12, 2022

img_map_placeholder

To Be Determined, Pearl, MS


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.