BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 9, 2022 at 7:00 PM

Updated January 26, 2024

Renovation of an educational facility in Fitchburg, Massachusetts. Completed plans call for the renovation of a educational facility.

Longsjo Middle School Window and Door Replacement Project - GC Longsjo Middle School Window and Door Replacement Project. The Longsjo Middle School was built in 1936 and is masonry construction. The project will include improvements and replacements to existing exterior aluminum windows throughout the building and original exterior wood doors and frames in select areas. The current window systems throughout the school are pre-finished aluminum double hung operables. The original exterior wood door and frame systems will be removed in entirety with new hollow metal frame and door systems. The general bidder must be DCAMM certified in Metal Windows. General Bid Deadline 11/17/22 Time 2:00 P.M. Completion Date: September 7, 2023

Bid Results

Educational

$3,498,000.00

Public - City

Renovation

23

21

3

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
633
Active Projects
298
Bidding Soon
4,666
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2022

February 8, 2023

Project location map

98 Academy St, Fitchburg, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.