Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 7, 2026 at 8:00 PM

Updated May 20, 2026

Site work, paving and outdoor lighting for a mixed-use development in Cheyenne, Wyoming. Working plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and for outdoor lighting for a sidewalk / parking lot.

The work includes, but is not limited to, (Insert Description Here) including: removal and replacement of concrete parking lot and drive areas, curb and gutter replacement adjacent to property 17th Street, concrete sidewalk replacement, ADA improvements, drainage improvements, lighting improvements, and landscaping. Site includes work inside City of Cheyenne public right-of-way. Est. Completion Date: Aug. 2, 2024

Final Planning

Sidewalks / Parking Lot

$498,690.00

Public - County

Outdoor Lighting, Paving, Site Work

14

14

19

8

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
29
Bidding Soon
650
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2025

April 30, 2026

Project location map

1514 E 16th St, Cheyenne, WY

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed