BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in San Diego, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Project Type Bid Response Types Line Items Subcontractor Bid Bond Contractor's Certification of Pending Actions (required) Mandatory Disclosure of Business Interests Form (required) Prime Contractor - Debarment and Suspension (required) Subcontractor - Debarment and Suspension (required) Subcontractor Listing for Alternate Items (required) Type of Award Lump Sum Bid No- K-23-1821-DBB-3-B-C License Requirements A Bid Valid 120 Calendar Days Liquidated Damages $1,000 Per Day Project Duration 640 Working Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% To install new concrete sidewalk on the west side of 70th street between Alvarado Road and Saranac Street. The work is to include installation of new 4' and 5' wide concrete sidewalk, curb ramp, curb and gutter, retaining walls, pedestrian push buttons, chain link fencing, bike lane striping, traffic and signing, and relocation/adjustment of pedestrian barricade and signs. MONTEZUMA PPL/MID-CITY PIPELINE PH 2: To install new water pipeline, which consists of approximately 4,880 linear feet of new 66" diameter CML & TC steel transmission main and 374 linear feet of 8-inch PVC distribution main. Work also includes associated required street ADA improvements and paving. The 66-inch transmission main will run southward from the Alvarado Water Treatment Plant (AWTP) to the intersection of 69th and Mohawk Street. The north terminus of the pipeline will be connected to existing Valve Vault No. 3 located where the Earl Thomas Reservoir Outlet Pipeline intersects the Clear Wells Interconnection Pipeline. The south terminus will connect to the Mid-City Phase 2A Pipeline just easterly of the 69th and Mohawk Street intersection. Additionally, work includes the relocation and construction of a Helix Water District 8-inch PVC distribution main running across Lake Murray Blvd and relocation of a City of La Mesa 8-inch sewer pipeline and associated manholes. Lastly, the landscaped medians along Lake Murray Blvd will be removed and rebuilt as part of this project. Pre-Bid Meeting No Online Q&A No ESTIMATED CONSTRUCTION COST- 46,900,000. 1. SLBE participation 8.5% 2. ELBE participation 13.8% 3. Total mandatory participation 22.3% Any questions related to this solicitation shall be submitted to: RRiego@sandiego.gov P.no- 9721.07 Question Deadline 03/31/2023 submitted to: RMcMinn@sandiego.gov; Questions received less than 14 days prior to the date for opening of Bids may not be considered. Proj No. 25-12E

Bid Results

Sidewalks / Parking Lot

$43,129,983.00

Public - City

Paving, Site Work

224

17

6

4

Subscribe For Documents

225 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
27
Bidding Soon
726
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2023

June 12, 2023

img_map_placeholder

Multiple Locations, San Diego, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.