BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Tarpon Springs, Florida. Design plans call for the construction of a clubhouse / community center; for site work for a clubhouse / community center; detention facility; and detention facility.

As of December 1, 2022, an architect has been selected for the project. Construction is not expected to start prior to 2025. *The closed solicitation has been included below for reference: The City of Tarpon Springs seeks to identify firms with substantial experience and capabilities to provide a variety of architectural and engineering design services including conceptual/preliminary design, design development, public meetings and presentations, preparation of bid and construction documents, and construction administration for construction of a community service building in the City of Tarpon Springs. The new facility will be located in the vicinity of the existing facility near Dorsett Park on Harrison Street in Tarpon Springs, eventually servicing as the replacement to the existing facility. The exact location of the new facility is to-be-determined through a site alternatives analysis to be conducted by the selected consultant. All work shall be in compliance with current code requirements. The selected consultant shall prepare all documents in the formats required by the City and shall adhere to all City deadlines so as not to negatively impact the project schedule. The new building will be known as the Cops 'N Kids Youth Center and will house office space for administrative staff, meeting/conference rooms, classrooms, locker rooms with showers, gymnasium (basketball court), employee break room, large kitchen, large food and supplies storage room(s), and laundry facilities. It is anticipated that the facility will be a one-story (approximately) 5,000 square foot facility with an attached covered driveway for child pickup/drop-off, though the building size may be adjusted as needed during design. Although not preferred, a multi-level facility configuration may be considered during the alternatives analysis phase if space limitations become a factor during the evaluation. The method of contractor selection has not been determined at this time.

Design

Clubhouse / Community Centers

$1,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
40
Bidding Soon
863
All Active Projects
350
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2025

img_map_placeholder

555 E Harrison St, Tarpon Springs, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.