BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Moss Point, Mississippi. Conceptual plans call for site work for a water / sewer project.

As of October 30, 2023, information regarding an award for this solicitation is not available. At this time, it is not known if an award has been made. Closed solicitation has been included below for reference. ……………….. West Jackson County Utility District will be accepting qualification statements for engineering services for PHASE 5 - SRF PROJECT from the Mississippi Department of Environmental Quality (MDEQ). Scope of work generally includes sewage pumping stations, pressure force mains, gravity sewer lines and sewer system rehabilitation. Engineering services shall include providing program management, surveying, maps, plats, engineering design, bidding, contract administration, construction observation services and contract closeout documents including field survey verification of construction and preparation of as-built drawings. Criteria for engineer selection shall be based upon the following: Qualifications Criteria Description of Criteria Weight Knowledge Evidence of specialized training and education required for engineering design and construction of a public sanitary sewer 20% Ability to Serve Demonstrate the availability of resources necessary to meet the project schedule required by the Owner for funding 20% Experience Evidence of sufficient professional engineering experience with similar sanitary sewer projects including experience with similarly funded projects 20% Past Performance Prior experience with West Jackson County Utility District 20% Communication Ability to communicate in a timely and thorough manner 15% References Provide three or more references from previous clients for whom similar projects have been completed 5% Three engineers will be selected for interview from the qualification statements received. Upon completing the interview process, contract negotiations will proceed with the most highly qualified engineer. In the event that a contract cannot be negotiated with the most highly qualified firm, negotiations will continue in order of qualification. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$15,000,000.00

Public - County

Site Work

4

3

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
16
Bidding Soon
375
All Active Projects
174
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2023

img_map_placeholder

Multiple Locations, Moss Point, MS


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.