Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published July 18, 2024 at 8:00 PM
Updated August 10, 2024
Site work and addition to a mixed-use development in Abbotsford, British Columbia. Completed plans call for the addition of a 26,827-square-foot, two-story above grade educational facility; and for site work for a educational facility.
The project consists of a two-storey addition with 8 learning spaces including corridors, an enclosed courtyard, a mechanical space, two stairwells, an elevator, and washrooms. The addition will be on the East end of the school and the connection to the main school is straightforward. Two portables are currently located on the Northeast side of the site, with playfields located to the East. One of these portables will be relocated on site, as will the existing watermain partially in conflict with the proposed footprint. The existing basketball courts will also be relocated further to the East onto the West end of the playfield. The existing SROW will require discharge and replacement with a new SROW to contain the relocated watermain. The perimeter of the proposed addition aligns with the north side drop off lane, allowing a minimum 1800mm walkway around the entire footprint. The addition will be sprinklered and connected to the existing building fire alarm system. An additional 36 parking stalls will be required by the City of Abbotsford for the new addition and will be constructed off the existing lane running north/south on the site. New parking may encroach onto the existing sports field and if so, will impact the irrigation and drainage of the field.
Post-Bid
Educational
$12,000,000.00
Public - State/Provincial
Addition, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 9, 2024
January 2, 2025
33231 Bevan Ave, Abbotsford, BC
Related To This Project
Abbotsford, BC
--
Abbotsford, BC
--
Abbotsford, BC
Bid Date: Aug 18 2022
Abbotsford, BC
--
Abbotsford, BC
--
Abbotsford, BC
--
Abbotsford, BC
Bid Date: Jun 21 2023
Abbotsford, BC
Bid Date: Nov 28 2022
Abbotsford, BC
--
Abbotsford, BC
--
Abbotsford, BC
--
Abbotsford, BC
--
Abbotsford, BC
--
Abbotsford, BC
Bid Date: Nov 09 2022
Abbotsford, BC
Bid Date: Aug 19 2022
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed