BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a restaurant in Minneapolis, Minnesota. Completed plans call for the renovation of a 9,890-square-foot restaurant.

No prebid meeting will be held. A. The conditions set forth in the other Project Manual Divisions, the Construction Drawings, and related or included References are hereby made a part of this Section and apply to all work in this Section. 1.2 PROJECT A. This Project shall generally include the work shown on Drawings related to the construction of the Bde Maka Ska Refectory - Food Service Equipment and related site and street improvements. The Work shall include, but is not limited to: 1. Mobilization 2. Providing and installing Food Service Equipment. B. Work of the Project consists of all labor, materials, articles, equipment, incidentals, items, tools, services, supplies, methods, operations, and skills in such quantities as may be necessary to complete the project within the intent of the Contract Documents. RESPONSIBILITY OF THE FOOD SERVICE EQUIPMENT CONTRACTOR A. Work will be accomplished under a Single Prime Contract including but not limited to providing and installing Food Service Equipment. B. The Food Service Equipment Contractor shall supervise and direct the Work as required by the Contract Documents. The Food Service Equipment Contractor shall be responsible for the scheduling and general management of the Work and for the acts and omissions of all of their employees including Subcontractors, their agents and employees, and all other personsperforming any of the Work for the Food Service Equipment Contractor. C. Prior to construction, the Food Service Equipment Contractor shall coordinate scheduling and execution of the Work with the continued use of the site and facilities by the General Building Construction Contractor, Building Subcontractors, the Owner, and the public. The Food Service Equipment Contractor will coordinate with the General Contractor, and Owner Representative to assure that the Construction and Owners daily operations, programming, events or any other ongoing activities occurring onsite during construction can continue without interruption or significant modification. 1. The Food Service Equipment Contractor shall be solely responsible for all construction means, methods, techniques and procedures, and for coordinating all portions of the Work under this Contract. 2. The Food Service Equipment Contractor shall be responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the Food Service Equipment Work. 3. In all cases of discrepancies discovered by the Food Service Equipment Contractor between any information shown on the Construction Drawings including, but not limited to, dimensions and details, or between the Construction Drawings and the Specifications, such cases shall be resolved according to the Contract Documents. The City of Minneapolis is issuing this Call for Bids for prospective suppliers to provide all materials, labor, equipment and incidentals for the supply and installation of the Bde Maka Ska Refectory-Kitchen Equipment, for the City of Minneapolis, all in accordance with the provided specifications, event line items and all documents requested herein. A contractor responding to this solicitation document swears that they are in compliance with the minimum criteria in Minnesota Statutes, section 16C.285, subdivision 3, and shall upon request submit to the city a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria.

Bid Results

Restaurant

$465,000.00

Public - City

Renovation

14

10

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
45
Bidding Soon
801
All Active Projects
348
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2022

April 1, 2023

img_map_placeholder

3000 E Bde Maka Ska Pkwy, Minneapolis, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.