Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a restaurant in Minneapolis, Minnesota. Completed plans call for the renovation of a 9,890-square-foot restaurant.
No prebid meeting will be held. A. The conditions set forth in the other Project Manual Divisions, the Construction Drawings, and related or included References are hereby made a part of this Section and apply to all work in this Section. 1.2 PROJECT A. This Project shall generally include the work shown on Drawings related to the construction of the Bde Maka Ska Refectory - Food Service Equipment and related site and street improvements. The Work shall include, but is not limited to: 1. Mobilization 2. Providing and installing Food Service Equipment. B. Work of the Project consists of all labor, materials, articles, equipment, incidentals, items, tools, services, supplies, methods, operations, and skills in such quantities as may be necessary to complete the project within the intent of the Contract Documents. RESPONSIBILITY OF THE FOOD SERVICE EQUIPMENT CONTRACTOR A. Work will be accomplished under a Single Prime Contract including but not limited to providing and installing Food Service Equipment. B. The Food Service Equipment Contractor shall supervise and direct the Work as required by the Contract Documents. The Food Service Equipment Contractor shall be responsible for the scheduling and general management of the Work and for the acts and omissions of all of their employees including Subcontractors, their agents and employees, and all other personsperforming any of the Work for the Food Service Equipment Contractor. C. Prior to construction, the Food Service Equipment Contractor shall coordinate scheduling and execution of the Work with the continued use of the site and facilities by the General Building Construction Contractor, Building Subcontractors, the Owner, and the public. The Food Service Equipment Contractor will coordinate with the General Contractor, and Owner Representative to assure that the Construction and Owners daily operations, programming, events or any other ongoing activities occurring onsite during construction can continue without interruption or significant modification. 1. The Food Service Equipment Contractor shall be solely responsible for all construction means, methods, techniques and procedures, and for coordinating all portions of the Work under this Contract. 2. The Food Service Equipment Contractor shall be responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the Food Service Equipment Work. 3. In all cases of discrepancies discovered by the Food Service Equipment Contractor between any information shown on the Construction Drawings including, but not limited to, dimensions and details, or between the Construction Drawings and the Specifications, such cases shall be resolved according to the Contract Documents. The City of Minneapolis is issuing this Call for Bids for prospective suppliers to provide all materials, labor, equipment and incidentals for the supply and installation of the Bde Maka Ska Refectory-Kitchen Equipment, for the City of Minneapolis, all in accordance with the provided specifications, event line items and all documents requested herein. A contractor responding to this solicitation document swears that they are in compliance with the minimum criteria in Minnesota Statutes, section 16C.285, subdivision 3, and shall upon request submit to the city a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria.
Bid Results
Restaurant
$465,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 18, 2022
April 1, 2023
3000 E Bde Maka Ska Pkwy, Minneapolis, MN
Related To This Project
Minneapolis, MN
Bid Date: Nov 21 2022
Minneapolis, MN
Bid Date: Sep 22 2022
Minneapolis, MN
Bid Date: Jan 12 2022
Minneapolis, MN
Bid Date: Dec 10 2020
Minneapolis, MN
Bid Date: May 02 2019
Minneapolis, MN
Bid Date: Apr 09 2019
Minneapolis, MN
Bid Date: Dec 12 2019
Minneapolis, MN
Bid Date: Dec 08 2022
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Nov 10 2022
Minneapolis, MN
Bid Date: Nov 23 2022
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Nov 15 2022
Minneapolis, MN
Bid Date: Sep 07 2022
Minneapolis, MN
Bid Date: Sep 08 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.