BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a civil project in Seward, Nebraska. Completed plans call for the construction of a water / sewer project; for site work for a water / sewer project; road / highway; and for paving for a road / highway.

**As of January 6, 2023, this project will rebid. No definite date yet but it would be sometime second or third week of January 2023 ** Pre-Bid Meeting Info: None required. No Bids Received. Project shall consist of the construction of a 500,000-gallon elevated spheroid style water storage tank, all associated piping, valves, site grading, sodding, electrical, storm sewer modifications, paving improvements, demolition of the existing 200,000-gallon tank, controls, testing and disinfection, and all other miscellaneous items of construction indicated in the plans and specifications. Project shall consist of construction of a 500,000-gallon elevated spheroid steel water storage tank. 1. Bid Section I-500,000-gallon Elevated Water Storage Tank Work shall include all excavation, water main construction within five feet of the tank foundation, a prefabricated altitude valve skid structure by EFI or equal, pipe bedding, backfilling, grading, compaction, concrete foundation, erection of tank (including production of tank and foundation drawings by a State of Nebraska Registered Professional Engineer), purchase and installation of an automatic tank mixer, tank and piping disinfection and placement into service, tank painting (with the Base Bid to include a full-color logo as depicted in Appendix "C" of these specifications, internal tank lighting, tank overflow, obstruction and site lighting, tank electrical service and related equipment, site grading and coordination with sprinkler/sod installers, installation of communications duct banks, and all other incidental work for a complete and operational water storage tank as shown on the plans and described further in these Specifications. The bid item shall be on a Lump Sum basis. 2. Bid Section II-Miscellaneous Utility Work: Work shall consist of all excavation, installation of water mains,storm sewer and related work, bedding, backfilling, grading, valves, hydrants, disinfection and testing of new water mains, connections to existing water mains, fittings, pavement/sidewalk removal, seeding, sodding, and landscaping the site, installation of sprinkler system, special inspections and testing services, and all other incidental work as further described in the plans and in these specifications. The bid item shall be on a Unit Price basis. 3. Bid Section III-Existing Tank Demolition: Work shall consist of isolating the existing Seward 200,000-gallon multilegged elevated water tower from the system, demolishing and removing the tank, existing altitude valve and structure and other miscellaneous items identified on the plans,site restoration, abandonment of onsite water mains and all other items as shown in the plans and described in the Specifications. The Bid Section shall be on a Lump Sum Basis

Award

Water / Sewer

$3,187,600.00

Public - City

New Construction, Paving, Site Work

20

28

2

8

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
61
Bidding Soon
821
All Active Projects
378
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 29, 2023

May 29, 2023

August 1, 2024

img_map_placeholder

To Be Determined, Seward, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.