BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Texas City, Texas. Completed plans call for site work for a water / sewer project.

FireStation No. 4 Sanitary Sewer Project.This project consists of extending the 10" sanitary sewer line approximately 1650' from themanhole that was constructed to serve the hotel on Outlet Blvd. to the southeast side of theproposed fire station property. It is the sole responsibility of the bidder to ensure that his bid is actually in the Texas CityPublic Works Purchasing office prior to the expiration of the time and date above first written. Bid security in the amount of five (5) percentof the greatest amount bid must accompanyeach bid. It shall be each bidder's sole responsibility toinspect the site of the work and to inform himself regarding all local conditions under whichthe work is to be done. It shall be understoodand agreed that all such factors have beenthoroughly investigated and considered in thepreparation of the bid submitted. The Contractor and all Subcontractors for thisproject will be required to pay not less than theprevailing wage rates for the area of the project as required in the contract documents. Upon consideration of the proposals the CityCommission plans to award a Contract; however the Owner reserves the right to reject anyand all bids, to waive any and all formalitiesand technicalities, and to accept any bidwhich it deems advantageous to the owner.Each bidder agrees to waive any claim it hasor may have against the Owner, the Engineer,and their respective employees, arising out ofor in connection with the administration, evaluation or recommendation of any bid. Thesuccessful bidder will be required to furnish aperformance bond and payment bond in anamount of 100% of the total contract price. Completion- 75 calendar days

Award

Water / Sewer

$209,660.00

Public - City

Site Work

15

10

6

7

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
52
Bidding Soon
2,615
All Active Projects
1,008
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2022

December 19, 2022

img_map_placeholder

To Be Determined, Texas City, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.