Demolition, site work and addition to a mixed-use development in Ann Arbor, Michigan. Completed plans call for the addition of a medical facility; for the demolition of a medical facility; and for site work for a medical facility.

RFI responses will be posted to the original solicitation located at https://sam.gov in amendment format. Deadline for submission of RFIs for this solicitation is close of business January 25, 2023. No questions will be answered after this date unless determined to be in the best interest of the Government as deemed by the Contracting Officer. Telephone requests for information will not be accepted or returned. Project entitled Add Emergency Power to Central Chiller Plant, project number 506-21-110, which requires the contractor to furnish all labor, materials, supervision, equipment, and all other necessary resources to fully complete the work identified in the contract specifications and drawings. See Important Bidder Information starting on page 5 This acquisition is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses with the ability to accomplish the work via North American Industry Classification System (NAICS) code 238210. Place of Performance is at the Ann Arbor VA Medical Center, Ann Arbor, Michigan 48105 MAGNITUDE OF CONSTRUCTION: Between $1,000,000 and $5,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Contractor is to construct a new addition to Bldg 32, Energy Center, to house a new generator. Construction will include tying into the existing fuel farm to provide fuel for the new generator; providing and installing multiple ATS switches for the new standby power system that is designed to back-up the central chilled water plant; and installation of DDC controls that are to tie into and integrate with the facilities existing Siemens Design building management system. The contractor will receive a total of 540 days to complete the work. MBE (8.5%), WBE (6.9%), DVBE (100%) Project No. N6215110

Post-Bid

Medical

$5,000,000.00

Public - Federal

Addition, Demolition, Site Work

53

28

29

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
91
Bidding Soon
1,408
All Active Projects
582
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2023

April 10, 2023

img_map_placeholder

2215 Fuller Rd, Ann Arbor, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.