Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and addition to a mixed-use development in Ann Arbor, Michigan. Completed plans call for the addition of a medical facility; for the demolition of a medical facility; and for site work for a medical facility.
RFI responses will be posted to the original solicitation located at https://sam.gov in amendment format. Deadline for submission of RFIs for this solicitation is close of business January 25, 2023. No questions will be answered after this date unless determined to be in the best interest of the Government as deemed by the Contracting Officer. Telephone requests for information will not be accepted or returned. Project entitled Add Emergency Power to Central Chiller Plant, project number 506-21-110, which requires the contractor to furnish all labor, materials, supervision, equipment, and all other necessary resources to fully complete the work identified in the contract specifications and drawings. See Important Bidder Information starting on page 5 This acquisition is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses with the ability to accomplish the work via North American Industry Classification System (NAICS) code 238210. Place of Performance is at the Ann Arbor VA Medical Center, Ann Arbor, Michigan 48105 MAGNITUDE OF CONSTRUCTION: Between $1,000,000 and $5,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Contractor is to construct a new addition to Bldg 32, Energy Center, to house a new generator. Construction will include tying into the existing fuel farm to provide fuel for the new generator; providing and installing multiple ATS switches for the new standby power system that is designed to back-up the central chilled water plant; and installation of DDC controls that are to tie into and integrate with the facilities existing Siemens Design building management system. The contractor will receive a total of 540 days to complete the work. MBE (8.5%), WBE (6.9%), DVBE (100%) Project No. N6215110
Post-Bid
Medical
$5,000,000.00
Public - Federal
Addition, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 14, 2023
April 10, 2023
2215 Fuller Rd, Ann Arbor, MI
Related To This Project
Ann Arbor, MI
Bid Date: Nov 30 2022
Ann Arbor, MI
Bid Date: Nov 29 2022
Ann Arbor, MI
Bid Date: Nov 16 2022
Ann Arbor, MI
Bid Date: Jul 01 2022
Ann Arbor, MI
--
Ann Arbor, MI
Bid Date: Nov 09 2022
Ann Arbor, MI
--
Ann Arbor, MI
--
Ann Arbor, MI
--
Ann Arbor, MI
Bid Date: Sep 27 2022
Ann Arbor, MI
Bid Date: Nov 15 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.