BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Derby, Kansas. Completed plans call for site work for a road / highway.

As of December 29, 2022, project was awarded to Cillessen & Sons’ Inc., awarded amount is $220,916.55. The project is briefly described as follows: PART A: 2022 ON-STREET BIKE LANES - PH. 1 Nondiscrimination in Employment Bidders on this work will be required to comply with the Presidens Executive Order No. 11246. Requirements for bidders and contractors under this order are explained in the specifications. Proposals must be accompanied by a certified or cashiers check, or bid bond is acceptable to the City in an amount not less than five percent (5%) of the proposal. Checks are to be made payable to the City of Derby and drawn on a solvent Kansas Bank or Trust Company. These checks or bonds are to be retained by the City Clerk until the contract for the project shall have been awarded. Questions or clarifications regarding the bid documents should be directed to Ky at Ext. 1255 or emailed to kylouanghaksaphone@derbyweb.com PART A: 2022 ON-STREET BIKE LANES – PH. 1 1 703 SF 4 Concrete Sidewalk (w/Fibermesh) 2 63 SF Truncated Dome Surfacing 3 70 LF Remove & Reconstruct Curb & Gutter 4 16 EA Sign – Bike Lane (R3-17) (24x18) 5 3 EA Sign – Bike Lane Ahead (R3-17 / R3-17aP) (24x18 / 24x8) 6 4 EA Sign – Bike Lane Ends (R3-17 / R3-17bP) (24x18 / 24x8) 7 4 EA Sign – Bike Route w/Arrow Right (D11-1 / M6-1R) (24x18 / 2x9) 8 6 EA Sign – Turning Vehicles Yield to Bicycles Right (R10-5R) (0x30) 9 6 EA Sign – Turning Vehicles Yield to Bicycles Left (R10-5L) (30”x30) 10 30 EA Pavement Marking – Bike Lae Symbol 11 6,534 LF Pavement Marking – 4 12 12,745 LF Pavement Marking – 6 13 203 EA Pavement Marking – 8 Chevron 14 1 LS Traffic Control 15 1 LS Site Clearing & Restoration PART B: PUBLIC WORKS – 2022 PAVEMENT MARKINGS 16 669 LF 24 White Stop Bar – Thermoplastic w/Grinding 17 50 LF 24 White Stop Bar – Paint w/Grinding 18 1,992 LF 24 White Crosswalk Bar – Thermoplastic w/Grinding 19 1,642 LF 24 White Crosswalk Bar – Paint 20 8,597 LF 4 White Line – Paint 21 116 LF 4 White Lane Line – Paint w/Grinding 22 750 LF 4 Double-Yellow – Thermoplastic w/Grinding 23 14,000 LF 4Yellow – Paint 24 18,860 LF 4 Double-Yellow Paint 25 1,556 LF 4 Double-Yellow Paint w/Grinding 26 625 LF 6 White Lane Line – Thermoplastic w/Grinding 27 4,661 LF 6 White Lane Line – Paint 28 10,502 LF 6 White Edge Line – Paint 29 280 LF 6 White Skip Line – Thermoplastic w/Grinding 30 4,120 LF 6 White Skip Line – Paint 31 7 EA Arrow – Thermoplastic w/Grinding 32 8 EA Arrow – Paint w/Grinding 33 65 EA Arrow – Paint

Award

Roads / Highways

$220,917.00

Public - City

Site Work

8

5

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
9
Bidding Soon
206
All Active Projects
90
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.