EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 30, 2022 at 7:00 PM

Updated October 1, 2024

Site work for a road / highway in Hayward, California. Completed plans call for site work for a road / highway.

Project Description: The work consists, in general, of installing two City owned trash capture CDS units and two City owned precast diversion structures, furnished by Contech, including lifting CDS unit in place, cutting into and connecting existing storm drain RCP's to CDS units, pouring two cast in place diversion weirs, installing manhole risers, shoring, excavation, and backfilling, bypass pumping and/or groundwater dewatering, construct two new driveways and a gravel pad for maintenance trucks, traffic control and such other items or details as required for a fully functioning trash capture device system as required by the plans, standard specifications, or these special provisions. The work is to be completed within ninety (90) working days. The CDS units and diversion structures will be pre-purchased by the City and furnished by the time of the installation. Contractor shall coordinate with Contech regarding the delivery schedule as well as the installation recommendations and drawing/specifications of the CDS units and diversion structures. The Contractor shall pay to the City of Hayward the sum of $3,000.00 per day in excess of the number of working days prescribed above, for each and every calendar day's delay in finishing the work. See details in the Special Provisions. At the time this contract is awarded, the Contractor shall possess either a Class A or Class C-34 license. When a construction contract is greater than $1,000,000, the contract is subject to the Community Workforce Agreement approved by the Hayward City Council on April 14, 2015. The successful bidder and all subcontractors, at any tier, will be required to sign an Agreement to be Bound which can be found in Exhibit G in the Special Provisions as a condition precedent to entering into any contract for this project. Pursuant to Section 1770 of the Labor Code, the Director of the Department of Industrial Relations has ascertained the general prevailing rate of per diem wages applicable to the work to be performed, which rates are filed in the office of the Engineer, and copies of which are available to any interested parties on request. In accordance with Labor Code Section 1771.1, a contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, or engage in the performance of any contract for public work unless currently registered with the State Department of Industrial Relations and qualified to perform public work pursuant to Labor Code Section 1725.5. Section 1771.1 applies to any bid proposal submitted on or after March 1, 2015 and/or any contract for public work entered into on or after April 1, 2015. Job Site Notices. Contractor shall post a Job Site Notice for this project pursuant to Title 8 California Code of Regulations Section 16451. The Contractor may elect to receive 100 percent of payments due under the contract from time to time, without retention of any portion of the payment by the City, by depositing securities of equivalent value with the City in accordance with the provisions of Sections 22300 of the Public Contract Code. All expenses of such substitute deposit shall be borne by the Contractor. Securities eligible for investment under the section shall include those listed in Section 16430 of the California Government Code or certificates of deposit of a bank or savings and loan association. The Contractor shall be the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereon. Such securities, if deposited by the Contractor, shall be valued by the City's Finance Director (Treasurer), whose decision on valuation of the securities shall be final. Alternatively, upon the Contractor's request, the City will make payment of retentions earned directly to the escrow agent. The Contractor may direct the investment of the payments into securities, and the Contractor shall receive the interest earned on the investments upon the same terms provided for securities deposited by the Contractor. Upon satisfactory completion of the contract, the Contractor shall receive from the escrow agent all securities, interest and payments received by the escrow agent from the City, pursuant to the terms in Section 22300 of the Public Contract Code. The City of Hayward will not be a distribution point for the bid documents. The bid documents may also be reviewed at the various builders' exchanges and construction service offices throughout the San Francisco Bay Area. All questions about the meaning or intent of the Bidding Documents are to be submitted to City's project manager by email. Interpretations or clarifications considered necessary by City in response to bidder questions will be issued by Addendum delivered to all registered plan holders. Questions received less than 5 days prior to the date for opening of Bids may not be answered. Only questions answered by Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect.

Post-Bid

Roads / Highways

$964,000.00

Public - City

Site Work

8

16

2

8

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Special Foundations
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Concrete Curbs and Gutters, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
131
Bidding Soon
2,157
All Active Projects
906
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2022

December 29, 2022

img_map_placeholder

Tennyson Rd, Hayward, CA

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Trash Capture Device Installation on Tennyson Road Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.