BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Saint Louis, Missouri. Working plans call for the renovation of a medical facility.

657-21-117JB Correct Deficiencies Identified During Triennial Testing 8-3-2023 Scope of Work (See Plans and Specifications for the full Scope of Work) The Construction firm must provide construction services as delineated in the Plans and Specifications. The following deficiencies below were identified during the FY2019 Triennial Electrical Testing required under VHA Directive 1028. This project will correct deficiencies remaining after testing. New equipment shall have all the required working clearances. Building 1 Replacement of panels per plans and specifications. Building 3 Replace Panel P3 in Basement Mechanical Room 001. Provide NEMA 3R, and misc per plans and specifications. Building 18 Replace panel(s) per plans and specifications. Building 24 Replace panels in Ground Floor Kitchen Room G06 per plans and specifications. Building 25 replace panels per plans and specifications. Building 51A Replace other issues per plans and specifications. Building 53 - Replace other issues per plans and specifications. The majority of electrical equipment in this facility has sprinkler heads, related water pipes and drainpipes directly over or within the spray pattern of the electrical equipment as represented by the picture to the right. Install protective covers to prevent water from getting into the electrical equipment nor are physical protective devices installed to protect the actual sprinkler heads from physical damage. Both are required by National Electric Code section 110.26(F)(1)(a) through (F)(1)(d). Shields need to be installed in all areas where electrical components are within the spray pattern or have overhead water lines to prevent damage to prevent overhead water sources (sprinklers and water lines) from penetrating the enclosures. Such penetration could lead to a potentially catastrophic failure. Protective covers or cages need to be installed on unprotected sprinkler heads to prevent accidental activation with the same potential for catastrophic failure as mentioned above per plans and specifications.

Final Planning

Medical

$1,000,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
38
Bidding Soon
789
All Active Projects
305
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2023

October 16, 2023

img_map_placeholder

1 Jefferson Barracks Dr, Saint Louis, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.