Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a residential development in Rock Island, Illinois. Completed plans call for the renovation of a residential development.
The City of Rock Island is requesting bids from contractors for a rehabilitation project at a house located at 713 24th Avenue. This owner-occupied property will be undergoing rehabilitation using Housing and Urban Development (HUD) funds to ameliorate deteriorating and deteriorated conditions. All work shall be subject to HUD 35.930 and Environmental Protection Agency (EPA) regulations. The bidder shall submit a project plan using the design standards below that is in compliance with all applicable HUD, EPA, and State of Illinois regulations as well as all local building and zoning codes. The plan must include a clear project timeline and budget with line item costs. The contractor shall act as the general contractor for the project using subcontractors as required. Subcontractors that will be required should be clearly identified in the project plan. Remove and dispose of old furnace. Install a new 80% or higher rated gas furnace. Connect new system to the old supply and return air ducts. Inspect the gas line feeding fuel to the new unit making sure it is code complaint. Seal up duct work with Duct tape or Duct seal. There is a few supply ducts that have rusted and will need to be replaced. Check Flue on the roof making sure its secure, properly venting, and has a rain cap with storm collar. Replace the condensation pump and line. Mechanical permit required Alternative specifications shall be considered only if they are clearly justified, cost effective, and meet all project objectives. The contractor shall have 30 days to complete the work from the date of contract signing. Change work orders over the course of the project are strongly discouraged. Bidder Responsibility Bidders shall keep the bidding process confidential. Each bidder shall be fully acquainted with conditions relating to the site, the scope of work, any current EPA and HUD regulations pertaining to the work, and restrictions associated with acceptable execution of requested work. Failure or omission of the bidder to acquaint themselves with site conditions shall in no way relieve them of any obligation with respect to their bid or subsequent contract. Federal, State, and Local Reporting Compliance The contractor shall provide financial and programmatic information as required by the City of Rock Island to comply with all Federal, State, and local law reporting requirements. The contractor shall also adhere to all applicable Federal, State and local regulations including but not limited to the following. o US Department of Housing and Urban Development (HUD): 24 CFR 35 o US Environmental Protection Agency (EPA): 40 CFR 745 o US Occupational Safety and Health Administration (OSHA): 29 CFR 1926 All questions shall be directed to the Construction Officer at 309-732-2906. Awarding Contracts The lowest bid shall not automatically guarantee that a contractor will get the work they bid on. Bids shall be reviewed for pricing, experience, previous work history, references, State Licenses, State Registration, insurances, bonds, subcontractors, equipment owned, equipment rented, operator experience, and financial stability. The City at its sole discretion shall decide after a review which contractor, if any, is responsive to the invitation to bid. All bidding and award procedures undertaken by the City in regard to this project shall be consistent with the City's adopted procurement procedures. Submitted bid prices shall remain valid for 60 days after bid opening. The bidder shall submit a project plan using the design standards below that is in compliance with all applicable HUD, EPA, and State of Illinois regulations as well as all local building and zoning codes. The plan must include a clear project timeline and budget with line item costs. The contractor shall act as the general contractor for the project using subcontractors as required. Subcontractors that will be required should be clearly identified in the project plan. Remove and dispose of old furnace. Install a new 80% or higher rated gas furnace. Connect new system to the old supply and return air ducts. Inspect the gas line feeding fuel to the new unit making sure it is code complaint. Seal up duct work with Duct tape or Duct seal. There is a few supply ducts that have rusted and will need to be replaced. Check Flue on the roof making sure its secure, properly venting, and has a rain cap with storm collar. Replace the condensation pump and line. Mechanical permit required Alternative specifications shall be considered only if they are clearly justified, cost effective, and meet all project objectives. The contractor shall have 30 days to complete the work from the date of contract signing. Change work orders over the course of the project are strongly discouraged.
Award
Residential Subdivision
$3,941.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 18, 2022
December 20, 2022
713 24th Ave, Rock Island, IL
Related To This Project
Rock Island, IL
Bid Date: Nov 04 2022
Rock Island, IL
Bid Date: Sep 14 2022
Rock Island, IL
Bid Date: Nov 11 2022
Rock Island, IL
Bid Date: Nov 17 2022
Rock Island, IL
Bid Date: Nov 30 2022
Rock Island, IL
Bid Date: Nov 17 2022
Rock Island, IL
Bid Date: Nov 29 2022
Rock Island, IL
Bid Date: Nov 17 2022
Rock Island, IL
Bid Date: Oct 31 2022
Rock Island, IL
Bid Date: Nov 09 2022
Rock Island, IL
Bid Date: Feb 02 2021
Rock Island, IL
Bid Date: Oct 07 2022
Rock Island, IL
Bid Date: Oct 12 2022
Rock Island, IL
Bid Date: Oct 12 2022
Rock Island, IL
Bid Date: Oct 21 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction leads in the industry. Period.
Get instant access to five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.