EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 30, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Dexter, Maine. Completed plans call for the renovation of a 8,900-square-foot educational facility.

Scope of work: Remove approximately 8900 sf of existing roofing, insulation, and Tectum roof deck to install new open-web, steel joists, steel deck, insulation, and EPDM roofing. All work shall be done from the above, leaving the existing ceiling in place. Structural Improvements and Reroofing at Dexter Regional High School in Dexter, Maine in accordance with Drawings and Specifications prepared by Lincoln/Haney Engineering Associates, Inc. and described in general as: Structural Improvements and Reroofing at Dexter Regional High School in Dexter, Maine A bid security is required for this project. Performance and Payment Bonds are required for this project. The Contractor must be prepared to complete the entire construction no later than August 25, 2023. AOS 94 reserves the right to reject any or all bids, to waive any irregularity in the bids and in the bidding, to accept any Bid that it may deem to be in its best interest, to negotiate the Contract Price with any bidder and to omit any item or items deemed advisable for its best interest.

Award

Educational

$599,875.00

Public - County

Renovation

9

13

9

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Erection, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Asbestos Remediation
Division 05 - Metals

Division 05 - Metals

Metal Joists, Steel Joist Framing, Metal Decking, Steel Decking
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Storm Drainage, Roof Drains
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Foundation Anchors

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
17
Bidding Soon
198
All Active Projects
86
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2022

June 19, 2023

img_map_placeholder

12 Abbott Hill Rd, Dexter, ME


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Structural Improvements and Re-roofing at Dexter High School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.