BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2022 at 7:00 PM

Updated January 26, 2024

Site work and outdoor lighting for a bridge / tunnel in Pawtucket, Rhode Island. Completed plans call for site work for a bridge / tunnel; and for outdoor lighting for a bridge / tunnel.

Project No: Y21722.01 Pawtucket Bridge 055001 PTS ID: 2605W The objective of this project is to replace the existing lighting at Bridge 550 in Pawtucket and implement an overheight detection system in East Greenwich and West Warwick, Rhode Island. RI DOT - Pawtucket Bridge Lighting and Bridge Strike Detection Systems R.I. Federal Aid Project No. STP-CARB(002) and R.I. Contract No. 2022-CT-056 are for the Pawtucket Bridge Lighting & Bridge Strike Detection Systems project. The project limits include I-95 over Pawtucket River Bridge 055001 between George Street and School Street in Pawtucket and I-95 between the Quaker Lane (Route 2) and New London Turnpike interchanges in West Warwick and East Greenwich. The work associated with the general lighting improvements and the installation of the overheight vehicle detection systems includes, but is not limited to, removal and replacement of architectural lighting, control system equipment and control cabling (as required) on Pawtucket River Bridge 055001 and the Pleasant Street Underpass 155101; installation of conduit and helical pile-mounted cabinets to improve maintainability of the lighting system; installation of overheight vehicle detection sensors and associated equipment; installation of guardrail; cleaning of catch basins; flushing of pipes; erosion control and all other incidentals necessary to execute the work complete in place and accepted within the limits of this contract to the satisfaction of the Engineer. Anticipated Notice to Proceed Date: February 24, 2023 Substantial Completion for OVDS: September 22, 2023 (7 months from NTP) Substantial Completion for Bridge 055001 Lighting System Replacement: December 1, 2023 (9 months from NTP)

Post-Bid

Bridges / Tunnels

$200,000.00

Public - State/Provincial

Outdoor Lighting, Site Work

307

47

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
648
Active Projects
351
Bidding Soon
4,633
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2022

February 24, 2023

Project location map

Multiple Locations, Pawtucket, RI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.