Site work for a transportation facility in Buffalo, New York. Completed plans call for site work for a transportation facility.

The Authority is in the Design Phase of a Light Rail System project that includes track replacement. The project design is scheduled for completion in Fall 2022 with phased construction starting in early 2023. As such, the Authority finds it necessary to procure long-lead delivery items, such as Precast Track Panels, to meet the construction schedule for rail systems. The Work of this Contract includes supply and delivery of the specified Precast Track Panels which will be installed under a separate construction contract starting in June 2023. Work includes engineering, design, testing, manufacturing, fabrication, assembly, furnishing and delivery of the specified materials including assemblies and components, obtaining contract bonds, import/export tariffs and any other work related to completion of this Agreement. The NFTA reserves the right to waive irregularities, to reject any or all bids and to extend the bidding period. Bid security must accompany each bid and must be in an amount not less than ten percent of the total bid price if the base bid exceeds $50,000.00. Bid security may be submitted prior to bid opening either electronically utilizing Surety2000 at portal, or delivered to the NFTA in an opaque sealed envelope. Details for electronic submission are provided on the NFTA's Engineering Branch website. In the event a bidder utilizes an offline bid but provides bid security electronically the electronic bid bond number must be submitted with the offline bid. The Contractor shall perform not less than 50% of the Work with its own forces. The time of completion for the project is 511 calendar days after receipt of the Notice to Proceed. Liquidated damages will be assessed against the Contractor for its failure to complete the project within the time specified. Refer to Technical Specification Section 01 11 00 "Summary of Work" for additional time constraints and associated liquidated damages. Pre-bid questions electronic submission only are due by 3:00 pm November 10th, 2022. M/WBE participation shall be 0% MBE and 2% WBE. SDVOB participation shall be 0%. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 0% Women Owned Sub-Contracting Goal: 2% Service-Disabled Veteran-Owned Business Contracting Goal: 0% Location: 400 Block, Main Street, Buffalo NY 14203

Award

Transportation Terminals

$1,437,970.00

Public - State/Provincial

Site Work

4

8

4

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
97
Bidding Soon
2,483
All Active Projects
1,028
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2022

January 5, 2023

img_map_placeholder

400 Main St, Buffalo, NY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.