Published December 27, 2022 at 7:00 PM

Updated January 25, 2024

Site work for a detention facility in Portage, Wisconsin. Completed plans call for site work for a detention facility.

Fence Improvements. In general the work consists of removing the existing perimeter Non-Lethal Electric Fence (NLEF) and replacing it with a new perimeter NLEF at CCI. The new NLEF will be located on the interior (inmate/institution) side of the inner perimeter fence. The existing electronics and controllers will be replaced. This project is being let using a new single trade bidding and contracting process. When 85% or more of the construction cost of a project could be completed by a Single Trade Contractor (mechanical, electrical, plumbing, or fire protection), the Department may bid and contract all work of that construction project directly to a Single Trade Contractor. The State will enter into a single contract with the lowest, qualified, responsible, certified single trade MEP contractor. Single trade MEP contractors may bid on single trade projects up to their current division of work certification level for that trade. All Work for this project will be awarded to a single trade Electrical contractor. Bidders shall submit a Single Base Bid for all Work. Sealed bids will be received as follows, before the time indicated above: US Mail or Third-party delivery (UPS, Fedex, or DHL) to State of Wisconsin Administration Building, 7 th Floor, 101 East Wilson Street, Madison, Wisconsin 53703; or Hand delivery to the drop box labeled SEALED BIDS ONLY in front of the State of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703. Base Bids will be received as follows: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Bid Results

Jails / Prisons

$2,671,000.00

Public - State/Provincial

Site Work

18

10

6

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Asbestos Remediation
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork Methods, Soil Stabilization, Shotcrete Soil Slope Stabilization
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Plants, Shrubs, Trees
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
62
Bidding Soon
993
All Active Projects
341
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2022

February 13, 2023

img_map_placeholder

2925 Columbia Dr, Portage, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.