Renovation of an educational facility in Lincoln, Illinois. Completed plans call for the renovation of a educational facility.

Location- 100 7th St Lincoln, IL 62656 Base Bid: Central Elementary School, approximately 47,320 sq. ft. Contractor verify sq. ft. The existing heating system is supplied hot water to VAV boxes throughout the building from 3 (2 almost new) condensing boilers. The three condensing boilers will be turned over to the School District. Existing cooling is provided by one chiller. The piping to VAV boxes is 4 pipe supply and return. The Mechanical Room is adjacent to the Gym. There are two Fan Rooms, one above the stage and one above the 2 nd floor corridor. a. Electrical Demolition and Re-Installation 1) Room 101: 1 - 2x4 light fixture; Room 103: 1 - 2x4 light fixture, 1 speaker; Room 104: 2 - 2x4 light fixture; Room 105: 5 - 2x4 light fixture, 1 speaker, 2 emergency light fixture; Room 111: 9 - 2x4 light fixture, 4 speakers, 2 emergency light; Room 112: 1 - 2x4 light fixture; Room 117: 1 - 2x4 light fixture; Room 122: 1 - 2x4 light fixture; Room 125: 1 - 2x4 light fixture; Room 130: 4 - 2x2 light fixture; Room 131: 2 - 2x4 light fixture; Room 132: 2 - 2x4 light fixture; Room 133: 1 - 2x4 light fixture; Room 135: 4 - 2x4 light fixture, 2 speakers; Room 136: 7 - 2x4 light fixture, 2 speakers, 3 emergency lights; Room 137: 2 - 2x4 light fixture; Room 139: 1 - 2x4 light fixture; Room 149: 1 - 2x4 light fixture; Room 157: 5 - 2x4 light fixture, 2 speakers, 2 emergency lights; Room 165: 1 - 2x4 light fixture; Room 201: 1 - 2x4 light fixture; Room 202: 10 - 2x4 light fixture, 4 speakers, 3 emergency lights; Room 206: 1 - 2x4 light fixture; Room 212: 1 - 2x4 light fixture; Room 217: 1 - 2x4 light fixture b. HVAC Demolition and Re-Installation 1) Room 105: 2 - 2x2 air diffusers; Room 111: 1 - 2x2 air diffuser; Room 133: 1 - 2x2 air diffuser; Room 135: 2 - 2x2 air diffusers; Room 136: 3 - 2x2 air diffusers; Room 137: 1 - 2x2 air diffuser; Room 139: 1 - 2x2 air diffuser; Room 157: 3 - 2x2 air diffusers; Room 164: 1 - 2x2 air diffuser; Room 202: 3 - 2x2 air diffusers. 2. Provide new building loop piping system. Install branch piping to heat pumps. Remove and reinstall lay in ceiling as shown. Demolish piping as indicated; remove existing VAV units in rooms. 3. Modify (remove, alter, install) electrical system as noted on plans and/or to make new system operable. 4. Install new loop piping and branch piping to heat pumps for new HVAC system. 5. Install new heat pumps with copper condensate lines (except as noted on plans), new exhaust fans, and new energy recovery units as shown. 6. Install new controls as provided by heat pump manufacturer, or as specified herein. 7. Provide improvements to accommodate new equipment as noted. 8. Cover abandoned openings with masonry material to match surrounding walls. Repair ceilings with new grid and panels in areas indicated. Remove existing rooftop exhaust or F.A. intake equipment and install new equipment as indicated and repair roof. 9. Remove existing exhaust fans and replace with new as noted Proposals shall be delivered to the above Lincoln Elementary School District No. 27 Office prior to the time of opening. Proposals shall be clearly identified on the outside of the envelope as "Sealed Proposal" and list the project title as shown above. Immediately following the stated time, proposals will be opened and publicly read. Terms of the proposal: - Bid Security is required, 5% Bid Bond payable to Lincoln Elementary School District No. 27 - Owner protective bonds are required in the amount of 100% of the Contract value. - Illinois Prevailing Wage Act P.A. 86-799 and Illinois Certified payroll reporting P.A. 094-0515 apply to this contract. - Revised Statutes of the Illinois Criminal Code, apply, including the School code. - E-mail proposals received prior to bid due date and time will be read at bid opening. See specification section 002113 Paragraph 2.6.A.5. The Board of Education has the right to reject or accept any or all parts of all bids submitted and to waive any irregularities in the bidding and to accept the lowestresponsible bid.

Award

Educational

$1,325,000.00

Public - City

Renovation

21

16

17

6

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
22
Bidding Soon
388
All Active Projects
166
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2022

May 26, 2023

img_map_placeholder

100 7th St, Lincoln, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.