BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a residential development in Flat Rock, Michigan. Completed plans call for the demolition of a residential development.

Separate sealed proposals for Prime Contractors are invited for the following construction work: (#22201) Building Demolition and Related Work at Flat Rock Community Schools "Former" Administration Building, 26084 Gilbraltar Road, Flat Rock, MI 48134 for Flat Rock Community Schools, 28639 Division Street, Flat Rock, , Michigan. Proposals are to be separate per project and complete, including all trades (Sub-Contractors and Suppliers), as the successful Contractor will be considered a Prime Contractor entering into a direct contract with the Owner. The Architect Project Manager, will be at this meeting to collect proof of qualification documentation, clarify the bidding procedures, scope of work, identify any items of concern and answer questions from the Bidders for their preparation and submission of representative competitive bids. It is the Contractor's responsibility to assure the Architect has been furnished all necessary pre-approval information as listed in Instructions to bidders Art. 19 at or prior to this meeting. The Architect will assemble an official list of approved bidders two days after the mandatory pre-bid meeting. The list will be limited to Contractors who attend the entire pre-bid meeting, have signed an official attendance list, have checked out official plans and specifications from the Architect, and meet the minimum Contractor qualifications as listed in the Instructions to Bidders. Bids submitted by Contractors who are not on the approved bidders list or do not meet these pre-bid requirements will not be opened and will be returned to the bidder. The proposal must be accompanied by a certified check or bid bond by an approved surety company in the amount of five percent (5%) of the proposal submitted payable to the Owner. Proposals shall remain firm for a period of fortyfive (45) days after official opening of bids. The successful Contractor will be required to furnish performance, labor and material bonds, each in the full amount of the proposal if payments are issued prior to completion and/or the contract is $50,000.00 or more. All bidders must provide disclosure in compliance with MCL 380.1267 and attach this information to the bid. The bid shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the Owner or the employee of the bidder and any member of the board, intermediate school board, or board of directors or the superintendent of the school district, intermediate superintendent of the intermediate school district, or chief executive officer of the public school academy. The District shall not accept a bid that does not include this sworn and notarized disclosure statement. All bidders must provide a sworn and notarized statement in compliance with Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012 and attach this information to the bid. The District shall not accept a bid that does not include this sworn and notarized statement. The Owner reserves the right to waive any irregularities, reject any or all bids, or accept the bid that in the opinion of the Owner, will serve the best interests of the Owner. Building Demolition and Related Work at Former Administration Building

Post-Bid

Residential Subdivision

$60,000.00

Public - City

Demolition, Site Work

8

9

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
81
Bidding Soon
1,438
All Active Projects
576
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2022

January 9, 2023

img_map_placeholder

26084 Gibraltar Rd, Flat Rock, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.