Site work and paving for a mixed-use development in Muncie, Indiana. Completed plans call for site work for a educational facility; road / highway; for paving for a road / highway; and water / sewer project.

Scope of Work to include, but not limited to: Selective demolition; general earthwork; and installation of erosion control measures, storm and electrical utilities, unit pavers, asphalt pavement, concrete pavement, masonry walls, signage, and site furnishing Bid documents are also available to subcontractors upon request. Bids shall be properly executed, addressed to Ball State University Board of Trustees, submitted on Contractors Bid For Public Works Form 96 (revised 2013), as prescribed by the Indiana State Board of Accounts giving financial data as recent as possible and in no event older than 90 days. Each Bid must be accompanied by the contractors Minority, Womens, and Veteran Business Participation Plan, advising whether, and if so how the contractor will utilize Minority, Womens and Veteran owned enterprises as subcontractors or material suppliers on the project Each bid shall be accompanied by a certified check or bank draft, made payable to the order of Alan Finn, Vice President for Business Affairs and Treasurer for Ball State University, Muncie, Indiana, or by an acceptable bidders bond for an amount not less than 5 percent of the total bid price All copies of the Bid, the bid security, and any other documents required to be submitted with the Bid shall be enclosed in a sealed opaque envelope marked SEALED BID. The envelope shall be addressed to Ball State University Board of Trustees and shall be identified with the Project name, the Bidders name and address and, if the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope marked SEALED BID ENCLOSED on the face thereof. The contractor awarded work shall be required to furnish an acceptable surety bond in the full amount of the contract. The Contract shall be awarded in accordance with the provisions of IC 5-16-13. Pursuant to IC 5-16-13-7, the provisions of the law are incorporated by reference in each public works contract and Contractor agrees that pursuant to IC 5-16-13- 8 the public works project will not be structured other than in the contractor tier structure required by law. Contractor shall be required to comply in all respects with the provisions of IC 5-16-13 commencing with public works contracts, including but not limited to training programs, document preservation and availability of inspection and suspected worker misclassification procedures which commence with public works contracts. The provisions pursuant to IC 5- 16-13-10 (c), public works contracts commencing after December 30, 2016 include requirements for prequalification by the Indiana Department of Administration (IDOA). Ball State University reserves the right to reject any bids or all bids, to make any combination thereof, to waive any informality therein, and to return any unopened bids received after the time fixed herein. Bids received after the designated time for closing will be returned unopened. Bids may be withdrawn prior to the designated time, but no bids shall be withdrawn for a period of sixty (60) days thereafter Anticipated start date: May 8, 2023 Substantial completion date: stage 1: Aug. 18, 2023, Final: Oct. 27, 2023

Award

Educational

$1,151,000.00

Public - State/Provincial

Paving, Site Work

28

15

16

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Barriers and Enclosures, Temporary Tree and Plant Protection, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 26 - Electrical

Division 26 - Electrical

Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Unit Paving, Curbs and Gutters, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
61
Bidding Soon
1,162
All Active Projects
521
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2022

May 8, 2023

img_map_placeholder

2000 W University Ave, Muncie, IN

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

East Mall Phase 5 Site Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.