Site work for a water / sewer project in San Jose, California. Completed plans call for site work for a water / sewer project.

The City will not respond to any communication or question submitted directly to City staff or City consultants. Submit questions via Biddingo no later than Thursday, November 17, 2022 at 3:00 pm. The Project generally involves Install three Master Flow Meters and Pressure Transmitters in existing South Bay Water recycled water system to improve monitoring of recycled water delivery and leak detection. Each bid must be accompanied by cash, a certified check, a cashier's check or a bidder's bond in the sum of not less than 10% of the total aggregate amount of the bid. Checks shall be made payable to the order of the City of San Jose. Bonds shall be executed by a surety possessing a valid certificate of authority issued by the California Department of Insurance and shall name the City of San Jose as beneficiary. All bids must be addressed to the Director of Public Works, City of San Jose, shall bear the Project Number and Name and be in a sealed envelope. This project is a "public works" as defined in Sections 1720 through 1720.6 of the California Labor Code. In accordance with Chapter 14.09 of the San Jose Municipal Code entitled "Prevailing Wage Requirements for City Contracts Involving Public Works," the contractor will be required to comply with the prevailing wage provisions in California Labor Code Sections 1720 through 1861, and the City's Office of Equality Assurance is authorized to provide certain local enforcement of those provisions. As such, the contractor will need to pay not less than the general prevailing rate of per diem wages and the general prevailing rates for holiday and overtime work. Bidders must have a California contractor's license, classification A to bid this project. Bidder's attention is directed to those provisions of the Specifications which require the contractor to whom the contract for the work is awarded, to file with the City Clerk at the time the contract is executed, a Contractor's Payment Bond and a Bond for Faithful Performance meeting all the requirements of the Specifications and approved by the City Attorney of the City of San Jose. Bonds shall be executed by a surety possessing a valid certificate of authority issued by the California Department of Insurance and shall name the City of San Jose as beneficiary. The Contractor's Faithful Performance Bond shall be for 100% of the contract amount. The Contractor's Payment Bond shall be for 100% of the contract amount. Question Deadline 11/17/2022 03:00:00 PM PT

Post-Bid

Water / Sewer

$2,500,000.00

Public - City

Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Key and Card Control Units
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Service Connections
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
87
Bidding Soon
1,665
All Active Projects
738
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2022

January 30, 2023

img_map_placeholder

Multiple Locations, San Jose, CA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

SBWR Metering and Pressure Monitoring Improvements Phase I

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.