BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Baker City, Oregon. Contact the soliciting agency for additional information.

The work consists of removing snow, in accordance with 2. Maintenance Requirements for Snow Removal, below, from the following three State Snow Parks: Salt Creek Summit, Catherine Creek Summit and Clear Creek. See descriptions and locations below for each project area. This contract consists of one base year and two optional years for each location. The Forest Service anticipates making multiple awards to different Offeror's based on each of the Snow Parks. This work is funded in cooperation with the Oregon Department of Transportation (ODOT) with the U. S. Forest Service. These snow parks are designated winter recreation parking locations by the State, who provides a limited amount of snow removal funding through the Winter Snow Parking Permit program through ODOT. If ODOT fails to receive funding, appropriations, limitations or other expenditure authority which prohibits ODOT from reimbursing the Forest Service, then this contract may be terminated after minimum guarantees have been met. Work shall be completed during the Winter Snow Park seasons of November 1st through April 30th each year. Contractor shall regularly check snow depths on the roads and parking areas, and shall plow entire area when average snow depth at the parking area reaches or exceeds a trigger depth of 6" of snow accumulation. The Contractor shall contact COR for authorization prior to conducting maintenance on access roads when 6" snow depth trigger is not reached in parking areas (occurs infrequently; typically due to drifting caused by heavy wind). Snow removal shall typically avoid high traffic periods between 10 a.m. and 3 p.m. Salt Creek Summit Snow Park: The snow park is located approximately 12.5 air miles Southeast of Joseph, Oregon. The Salt Creek Summit Snow Park project consists of plowing snow from approximately 5.0 miles of Forest Rd. 39 (double-lane asphalt), 0.10 miles of Forest Rd. 3915 (double-lane asphalt), a 3.0 acre snow park, pedestrian access paths to the restroom facilities (approximately 50 feet), and pedestrian access paths to the Salt Creek Summit multi-purpose building (approximately 20 feet). One complete removal consists of plowing snow through one full width (22' minimum) and length of the project area. Though not an indicator of future plow needs, this Snow Park was plowed an average of 15 times per season in recent years. The lowest number of plows was 9 and the highest was 23. Clear Creek Snow Park: The snow park is located approximately 9 miles north of Halfway, Oregon. The Clear Creek Snow Park project consists of plowing snow from a 1.0 acre snow park (road loop and parking area), and from approximately 1.5 miles of NFSR 66 (single lane gravel w/ turnouts). One complete removal consists of plowing snow through one full width (14'minimum plus turnouts) and length of the road, and from approximately 800 feet of the snow park loop road (12' minimum width) plus the adjacent parking area for the snow park. Though not an indicator of future plow needs, this Snow Park was plowed an average of 7 times per season in recent years. The lowest number of plows was 4 and the highest was 13. Catherine Creek Summit Snow Park: The snow park is located approximately 20 miles east of Union, Oregon. The Catherine Creek Summit Snow Park project consists of plowing snow from a 2.0 acre snow park (road loop and parking area). One complete removal consists of plowing snow through one full width of the loop road (12' minimum width) and length of the project area (approximately 1200 ft.), plus the adjacent parking area. Though not an indicator of future plow needs, this Snow Park was plowed an average of 4 times per season in recent years. The lowest number of plows was 1 and the highest was 11. For Questions You Email andrea.pollock@usda.gov

Post-Bid

Roads / Highways

Public - Federal

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
2
Bidding Soon
48
All Active Projects
16
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2022

December 21, 2022

img_map_placeholder

Multiple Locations, Baker City, OR


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.