EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 16, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Rockford, Illinois. Completed plans call for the renovation of a water / sewer project.

Proposals must be enclosed in a sealed envelope and marked with the name of the RFP, and the RFP number. Each vendor shall submit with their proposal the information specified in the bid documents for compliance with the laws of the State of Illinois on Fair Employment Practices and with the City of Rockford's Ordinance on Equal Employment and Business Opportunity. Any proposal which fails to include the compliance items properly completed will not be read and will not be considered. The City of Rockford reserves the right to accept or reject any and all proposals and to waive technicalities. QA deadline -9 Nov 2022 The City of Rockford Water Division is currently looking to install temporary treatment at the location of Well No. 9 at 305 James Avenue in Rockford. The existing raw water at this site is treated with chlorine, fluoride, and polyphosphate before being pumped into the distribution system. Recent water quality testing for this site has shown elevated levels of manganese, so a temporary treatment system with filtration is being installed until a full-scale water treatment facility can be afforded. The existing well house is planned to be retrofitted to accommodate this temporary treatment equipment. The City is planning to install vertical pressure filters with pyrolucite media to remove said manganese. They will continue to treat the water with chlorine, fluoride, and polyphosphate after filtration is complete. Design engineering for the Well 9 Temporary Treatment project has been completed. The City of Rockford Water Division is seeking to retain the services of a qualified treatment manufacturer who can provide a temporary treatment solution that can be installed and operated for an estimated operation period of five (5) years with the option to increase said timeline at a later date. The company would be required to mobilize and install the equipment as well as demobilize the equipment upon the completion of use by the City. The proposed well site will have the capacity to pump 1,600 GPM through the temporary treatment system to the reservoir. Ultimately, high service booster pumps will pump the treated water to the distribution system.

Post-Bid

Water / Sewer

$270,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 11 - Equipment

Division 11 - Equipment

Healthcare Equipment, Examination and Treatment Equipment, Treatment Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Watering, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
318
Active Projects
204
Bidding Soon
2,690
All Active Projects
1,297
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2022

December 16, 2022

img_map_placeholder

305 James Ave, Rockford, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Well 9 Temporary Treatment Rental

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.