Renovation of a retail development in Bellefonte, Pennsylvania. Completed plans call for the renovation of a retail development.

**As of January 11, ,2023, contract 1 to 4 project was awarded to J.C. Orr & Son Inc. ,Bob Biter Electrical Enterprises , Marc Service Inc. and Preferred Plumbing & Heating Solutions for total of $7,927,232." Commonwealth Charter Academy State College Project Location: 2210 High Tech Road, Benner Twp., PA 16823. Owner's Representative: Jim Skinner, Commonwealth Charter Academy, One Innovation Way, Harrisburg PA 176110-1171; Telephone 717.710.3300, Extension 11174, jskinner@ccaeducate.me. Architect: Eric Phillips, Project Architect, Strada Architecture LLC, 611 William Penn Place, Suite 700, Pgh. PA 15219, Direct Dial 412.246.2839, ephillips@stradallc.com. Construction Contract: Bids will be received for the following Work: General Construction Contract Electrical Construction Contract Mechanical Construction Contract Plumbing Construction Contract The Owner shall procure separate proposals for Audio Visual, Information Technology and Security and shall assign oversight of those contracts to the successful General Construction Contractor for inclusion in their bid and Work.Each proposal shall be accompanied by an approved Surety Company's Bid Bond in the amount of 10% of the Base Bid. A certified check in the amount of 10% of the Base Bid is also acceptable.Bidders' Questions: Architect will provide responses at Prebid conference to bidders' questions received up to Three (3) business days prior to the initial site Prebid Meeting. All Questions shall be answered in writing and shall be included in official Addenda issued to bidders. Any information that was not included in an official Addenda, issued by the Owner is not valid. Successful bidder shall begin the Work on receipt of the Notice to Proceed and shall complete the Work within the Contract Time of Three Hundred Sixty-Five (365) Calendar Days.Bidders must submit qualifications statement with their bids, in the form required in the bidding documents, for their bid to be considered. The Owner reserves the right to award the contract to the lowest responsible and qualified bidder. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. A Performance Bond, separate Labor and Material Payment Bond, and Insurance in a form acceptable to Owner will be required of the successful Bidder. It is intended that this project will be constructed using Prevailing Wages Project Rates as determined by the Bureau of Labor Law Compliance for Centre County PA. Regulatory Requirements: The Project for which construction proposals are being solicited is subject to applicable provisions of the statues and regulations of the Commonwealth of Pennsylvania, including the Commonwealth Procurement Code, Pennsylvania Human Relations Act, the Anti-bid-Rigging Law, the Bid Withdrawal Act, the Public Works Contractors Bond Law, the Steel Products Procurement Act, the Public School Code of 1949, the Pennsylvania Prevailing Wage Act, the Resident Labor Statute, the Trade Practices Act, the Utilities Protection Act ("Pa. One-Call"), the Public Works Employment Verification Act, and the Act 114 FBI Fingerprint Report shall govern submittal, opening, and award of bids. Contract No. 1 - General Construction - J C Orr & Son, Inc. - $4,760,900.00 Contract No. 2 - HVAC Construction - MARC Service, Inc. - $1,105,562.00 Contract No. 3 - Plumbing Construction - Preferred Plumbing & Heating Solutions LLC - $415,000.00 Contract No. 4 - Electrical Construction - Bob Biter Electrical Enterprises Inc. - $1,645,770.00

Award

Retail

$7,927,232.00

Public - County

Renovation

93

18

130

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Stairs
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Ceilings, Acoustical Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Air Outlets and Inlets, Central Heating Equipment, Heating Boilers, Condensing Boilers, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Control-Voltage Electrical Power Cables, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Exterior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Electrical Utilities, Utility Substations
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
90
Bidding Soon
1,110
All Active Projects
407
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2022

February 16, 2023

Project location map

2210 High Tech Rd, Bellefonte, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.