BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 27, 2023 at 7:00 PM

Updated January 26, 2024

Renovation of an educational facility in Baltimore, Maryland. Completed plans call for the renovation of a educational facility.

Unit Ventilator and Pipe Insulation Replacement at Callaway Elementary School 251 Location- 3701 Fernhill Ave Baltimore, MD 21215 1. Replacement of existing hydronic piping and insulation throughout Callaway Elementary School. Piping and insulation replacement will include hydronic piping and air conditioning condensate drain piping to within 12 ft. of each unit ventilator and fan coil unit. 2. Replace existing heating water boilers. 3. Remove and reinstall ceilings in the vicinity of piping being replaced. 4. Remove and reinstall lighting in vicinity of piping being replaced. 5. Under Add Alternate No. 1, replace ceilings and lighting throughout the building. 6. Under Add Alternate No. 2, replace (6) hydronic isolation valves located in the Boiler Room and replace (2) hydronic heating system expansion tanks. 7. This project will be performed concurrently with a project under separate contract in which (32) unit ventilators and (38) fan coil units will be replaced; hydronic piping, air conditioning condensate drain and associated pipe insulation within 12 ft. of each unit will be replaced; and, pneumatic controls will be replaced with direct digital controls (DDC) throughout the school Questions Due By: November 16, 2022 by 4:00 p.m. MBE Participation (%) 22.0 African American MBE Participation (%)8.0 Women-Owned MBE Participation (%) 11.0 A. The overall goal for certified minority subcontractor participation for the ventilator replacement portion of this contract is 22% as specified in the solicitation and, which shall include sub goals of 8% for certified African American-owned businesses and 11% for certified women-owned businesses, if applicable. B. The overall goal for certified minority subcontractor participation for the pipe insulation replacement portion of this contract is 18% asspecified in the solicitation with no sub goals. All work under this contract shall be completed within twelve (12) months or 365 days

Bid Results

Educational

$5,073,000.00

Public - City

Renovation

123

24

16

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
542
Active Projects
247
Bidding Soon
3,619
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2022

January 2, 2023

Project location map

3701 Fernhill Ave, Baltimore, MD

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.