BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Redlands, California. Contact the soliciting agency for additional information.

Any agreement resulting from the successful proposal shall be for a three (3) year period and will require the submittal of quarterly monitoring reports. Select quarterly reports will include 1) an annual summary of monitoring activities (due in April of each year); 2) results of leachate sampling (performed in October of each year, with retesting performed in April of each year); and 3) the results of annual testing of leachate containment and recovery system equipment to be performed prior to October 31 of each year (required and reported to the Santa Ana Regional Water Quality Control Board (RWQCB). In addition, the agreement will require electronic submittal of groundwater and leachate analytical data into in a database each quarter as required by the State Water Resources Control Board. All supporting witnessing, supervision, analyses, documentation and liaison as needed and described herein will be provided. Monitoring Support. Consultant will collect the required samples from the designated sampling locations and submit samples to the City-selected, State-certified laboratory for analysis. Leachate samples will be collected and delivered to the laboratory by staff of Consultant. Task 1: Quarterly Groundwater Monitoring Reports. Consultant will perform all water quality sampling as required. During all monitoring reporting periods, Consultant will review field notes and laboratory data in a timely fashion so that data review is completed quickly and any required RWQCB notification meets the deadlines established in Order No. R8-2004-0008 including amendments stipulated in Order No. R8-2008-0094. The data review will include: Providing technical and regulatory expertise to City staff. Review of all field notes to verify that proper sampling techniques were utilized. A thorough data quality check to verify that holding times, required analyses, reporting limits and laboratory precision requirements have been met. Updating water level and groundwater quality databases. Performance of a thorough quality control check on all data to verify that only correct information is input into the databases. All sample analyses will be checked against sample collection dates to verify that holding times were met. Analytical results will also be checked to verify that all required analyses have been performed and that laboratory quality assurance results were within acceptable limits. Any identified problems will be detailed in the quarterly reports. The procedure for laboratory data entry includes manual transfer of data into the existing database. Water level information and field data will also be manually input. All data entered into the database will be checked to ensure that the database is accurate. Laboratory reporting limits, BPOs, and maximum concentration levels will be highlighted with bold font so that the reader can easily discern potential problems. Statistical analysis of the water quality data will be performed by Consultant. In addition to the statistical analysis of metals surrogates and selected general minerals, selected volatile organic compounds detected at the landfill since September, 1998, will be statistically analyzed to establish concentration limits equal to background concentrations during this portion of an extended evaluation monitoring period. VOC statistical analyses will be performed as data quantity and quality permit for each compound of concern, on a per-well basis, using intra-well methods as well as background-to-compliance comparisons. Charts and tables will be used to illustrate VOC statistical findings. The quarterly groundwater monitoring reports will include the following information: A transmittal letter containing an abbreviated summary, including discussions on violations and any actions taken or planned. An executive summary of current monitoring results. A discussion of groundwater occurrence and movement, including hydrographs for each well, Project Type RFP (Request for Proposal) Response Types Response File Type of Award Lump Sum Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Pre-Bid Meeting No Online Q&A Yes Q&A Deadline 11/08/2022 2:00 PM (PDT) The method of contractor selection has not been determined at this time.

Conceptual

Roads / Highways

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
89
Bidding Soon
2,084
All Active Projects
926
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2023

img_map_placeholder

California St, Redlands, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.