BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 18, 2022 at 7:00 PM

Updated January 26, 2024

Demolition, site work, remodeling, renovation and addition to an educational facility in Tyndall, South Dakota. Completed plans call for the addition of a 2,750-square-foot educational facility; for the demolition of a educational facility; for the remodel of a two-room educational facility; for the renovation of a educational facility; and for site work for a educational facility.

The CTE Addition project involves the construction of an approximately 2,750 square-foot Career & Technical Education addition on the west side of the high school to expand the existing shop area. Construction basis of design is masonry block with a sloped metal roof. CTE Addition occupancy is required before the locker room renovation can start. Due to grant funding requirements the final completion date of the CTE Addition shall be October 27, 2023. The Locker Room Renovation project involves the remodeling of two existing locker rooms and renovating the FACS classroom and an adjacent classroom into new locker rooms. Demolition work will include block wall removal, flooring/tile/ceiling/lighting modification, as well reconfiguration of the MEP system. The anticipated existing locker room remodel start date is May 1, 2023 with an expected completion date of August 11, 2023. The anticipated new locker room renovation start date is October 30, 2023 with an expected completion date of March 1, 2024. Pre-construction and submittals work related to the project is to commence immediately after receipt of the signed contract. The work onsite is anticipated to begin April 3, 2023. Expected project final completion is March 1, 2024. Bids must be accompanied by bid security in form of certified check, cashiers check, or bid bond in amount of 5% of base bid submitted, made payable to the owner, as guarantee that bidder will, if awarded, enter into contract in accordance with contract documents and submitted bid. Bon Homme School District reserves the right to reject any or all bids and waive any irregularities therein.

Post-Bid

Educational

$135,000.00

Public - County

Addition, Demolition, Remodeling, Renovation, Site Work

61

28

80

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
40
Bidding Soon
369
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2022

April 3, 2023

Project location map

1404 Fir St, Tyndall, SD

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.