BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fort Gibson, Oklahoma. Completed plans call for site work for a water / sewer project.

Site Directions: Fort Gibson Water Treatment Plant The project is consists of removal, testing, permitting and land application of residuals from three existing backwash storage lagoons at the Fort Gibson Water Treatment Plant. Bidders must bid on all items of the contract. The whole work under this contract will be awarded as a single contract to the lowest responsible bidder for the work. No bid may be withdrawn for at least sixty (60) days after the scheduled closing time for receipt of bids. Each proposal must be accompanied by a Bidder's Bond, or Cashier's Check upon any solvent Bank or Trust Company, payable without reserve to the Town of Fort Gibson, Oklahoma, in an amount not less than five percent (5%) of the total amount of the bid. Bid security of the two low bidders will be retained until approval of contract and execution of satisfactory bonds by the successful bidder, or until other disposition on the bids is made. The bonds required will be a Performance Bond, a Payment Bond, and a Maintenance Bond, each in the full amount of the contract. The Town will not accept letters of credit in lieu of any bond required herein. No pre-bid conference is scheduled. The bidder must supply all the information required by the bid and proposal form including completion of affidavits or his bid will be considered incomplete and therefore rejected. The Town may request of any bidder, before his bid is considered for award, that he submit a statement of facts as to his previous experience in performing work of the same character and magnitude, as to his business and technical organization, and financial resources and plant available and to be use in performing the contemplated work. Each bidder must have such information, together with a recent financial statement, available upon request. This project is to be paid by local funds. Contract to be awarded to low responsive responsible bidder. The Owner reserves the right to waive any informalities in the bidding and the right to reject any and all bids in accordance with the Oklahoma Competitive Bidding Act. Conditional bids shall not be accepted. Fort Gibson Utilities Authority Fort Gibson, Oklahoma By: James Walters Manager

Bid Results

Water / Sewer

$52,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
43
Bidding Soon
745
All Active Projects
278
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2022

January 5, 2023

img_map_placeholder

200 E Poplar St, Fort Gibson, OK

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.