Published October 4, 2024 at 8:00 PM
Updated October 1, 2024
This is a service / maintenance or supply contract in Anoka, Minnesota. Contact the soliciting agency for additional information.
As of October 4, 2024, the City has retained the services of an engineer to manage the team of consultants (consultants) selected to complete the feasibility study for the Rum River Dam Modification Project. They will provide design services related to maintenance platform across the dam, integration of the proposed project with the downtown public realm and lighting design. The Anoka Dam Modification Project construction costs are estimated at $11.95 million. The amount requested to complete the feasibility study and begin the engineering design to work toward shovel ready plans for the project is $500,000. Modifications include the appropriate retrofit, modification and/or reconstruction of several components of the dam to achieve the following: - Operational and safety improvements, including an automated crest gate system to replace the flashboards and construction of maintenance platform to aid in safe removal of deadfalls and debris. Alleviates need for crew to traverse the dam under varying conditions to install flashboards. The platform will also provide a pedestrian crossing and trail connection improving pedestrian mobility and safety. - To support the generation of hydroelectric power to provide green energy - Renovation of the spillway to create a lock or implementation of some other structure that would allow small watercraft to portage the dam - To facilitate recreational river surfing below the dam - To create a fish passage and to enhance environmental benefits This project includes improvements for the intersections of Belt Line Road and Addison Road, Belt Line Roadand Beltway Road, and Addison Road and Sojourn Drive traffic signal and ADA pedestrian ramp. This includes a complete replacement and redesign of the traffic signals and ramps at the intersections. These improvements were identified in the asset management plan and the ADA transition plan. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Water / Sewer
$11,950,000.00
Public - City
Paving, Service, Maintenance and Supply, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 1, 2025
1915 1st Ave, Anoka, MN
Related To This Project
Anoka, MN
Bid Date: May 25 2023
Anoka, MN
Bid Date: May 23 2023
Anoka, MN
Bid Date: Jun 23 2023
Anoka, MN
Bid Date: Jun 08 2023
Anoka, MN
Bid Date: Jul 27 2023
Anoka, MN
Bid Date: Jul 27 2023
Anoka, MN
Bid Date: Apr 14 2023
Anoka, MN
Bid Date: Apr 21 2023
Anoka, MN
Bid Date: Apr 27 2023
Anoka, MN
Bid Date: May 04 2023
Anoka, MN
Bid Date: Mar 21 2023
Anoka, MN
Bid Date: Mar 30 2023
Anoka, MN
Bid Date: Apr 04 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.