BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a mixed-use development in Redlands, California. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.

As of December 15th, 2022 this project is pending an award decision. Replace existing light poles and fixtures with new and extend existing lighting System. Utilize existing 480v power system including existing conduit, wire and pull Boxes. Extend from existing pull boxes with new conduit and wire per plan and per NEC approved methods. Existing electrical system is to remain unaltered and undamaged by construction. New system to include post lights, bollard Lights, and in grade up lights. Project Duration: 90 Calendar Days Liquidated Damages: $500.00 Per Calendar Day Bid Bond Percentage: 10% Pre-Qualification for Bidders: Not Required Online Q&A Yes Q&A Deadline 11/15/2022 12:00 PM (PDT)

Bid Results

Playgrounds / Parks / Athletic Fields

$477,342.00

Public - City

Outdoor Lighting, Site Work

8

16

8

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
463
Active Projects
224
Bidding Soon
3,573
All Active Projects
1,593
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 22, 2022

December 22, 2022

March 22, 2023

img_map_placeholder

Multiple Locations, Redlands, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.