Site work and paving for a road / highway in Whittier, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Project Limit:Norwalk Bl at Balfour St; Norwalk Bl at Mines Bl; Norwalk Bl at Reichling Ln; Cully Av at Balfour St; Cully Av at Phelan Elementary; Glengarry Av at Coolhurst Dr; Reichling Ln at Glengarry Av; Broadway at Mines Bl; Rose Hedge Dr at Cedarcliff Av; Rose Hedge Dr at Gretna Av. Scope:Road reconstruction including bulb outs, curb ramp improvements, sidewalk improvements, new sidewalk, accessible pedestrian push buttons, and traffic loop improvements. Sealed bids will be accepted by Los Angeles County Public Works, Project Management Division III, for the curb ramp improvements, bulb outs, sidewalk improvements, road surfacing, and the performance of other appurtenant work under Project ID No. RDC0016316, Los Nietos Safe Routes to School Phase II, in unincorporated communities of Los Nietos and West Whittier. The work shall be done in accordance with the Plans and Specifications on file and open for inspection at Public Works. The work is estimated to cost between $1,700,000 and $2,500,000 and shall be completed in 80 working days. The prime contractor shall possess a valid California Class A contractor's license. Prebid questions regarding the Plans and Specifications shall be submitted via email only to: Ms. Agnes Nguyen at agnguyen@pw.lacounty.gov. The successful bidder must comply with Chapter 2.212 (COVID-19 Vaccinations of County Contactor Personnel) of County Code Title 2 - Administration, Division 4 as a condition of performing work under the contract. Bidders are advised to review the requirements of Chapter 2.212 (COVID-19 Vaccinations of County Contactor Personnel) and the sample contract requirements prior to submitting a bid. Each bid must be accompanied by a surety bond payable to County of Los Angeles in an amount equal to at least 10 percent of the bid to guarantee that the bidder will enter into the contract if it is so awarded. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. All persons performing the work shall be paid not less than the General Prevailing Wage Determination prepared by the Director of Industrial Relations pursuant to the State Labor Code. Copies of these wage rates are available at Public Works. The rate of compensation for any classification not listed in the schedule, but which may be required to execute the contract, shall be commensurate and in accordance with the rates specified for similar or comparable classifications or for those performing similar or comparable duties. The Disadvantaged Business Enterprise (DBE) goal for this contract is 15 percent. The County hereby notifies all bidders that it will affirmatively ensure that minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex, or national origin in consideration for award of any contract entered into pursuant to this advertisement. The County, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE (28.3%), WBE (6.9%), DBE (15%) It is anticipated the work will start in April 2023 and be completed in October 2023.

Bid Results

Roads / Highways

$1,684,238.00

Public - County

Paving, Site Work

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
269
Active Projects
168
Bidding Soon
2,486
All Active Projects
996
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2022

May 22, 2023

img_map_placeholder

Multiple Locations, Whittier, CA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Los Nietos Safe Routes to School - Phase II

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.