BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 23, 2025 at 8:00 PM

Updated September 24, 2025

Site work for a water / sewer project in Wahpeton, North Dakota. Design plans call for site work for a water / sewer project.

Construct 4 wells North and West of the Water Treatment Plant in the south 1/2 of Section 2, Township 133. A 14-inch raw waterline will need to be installed and connected to the existing raw waterline by well number 3. This potential project came forward as a result of the State Water Commission (NDSWC) aerial survey of the region and research of the aquifers in the area. Another branch of the Wahpeton Buried Valley Aquifer was identified. During the summer of 2021 Manikowski Well Drilling completed nine test wells. After the testing both Manikowski and the State Water Commission felt that there is plenty of water capacity in this area for municipal wells. The goal is to create four new clear water wells capable producing between 750 to 1,200 gallons per minute. Proposed well sites would include an onsite generator in the event of power interruptions/outages. Wires will be run between at least two wells so generator can run well in the event of a power outage. Dakota Valley Electric will provide the electric in this area. The 14-inch water main would be approximately 8 miles depending on the location of the wells. Land and easements would need to be purchased for the wells, raw waterline installation, and electrical power This project is included in the city's fy 2025 Capital Improvement Program. As of September 23, 2025, information regarding design firm and general contractor has not been released. Further details regarding firm construction and completion timelines have not been disclosed. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Water / Sewer

$5,545,175.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
23
Bidding Soon
246
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.