BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Ames, Iowa. Completed plans call for site work for a water / sewer project.

Question Cuttoff Date & Time 11/14/2022 11:00:00 PM (ET) This expedites the process and reduces errors for both buyer and supplier. Deliveries shall be F.O.B Destination. Additional Information Responders shall furnish any requested information within three (3) working days after notification from the purchasing agent. Approved Brands Any manufacturers' names, trade names, brand names, or catalog numbers used in the specification are for establishing and describing general performance and quality levels. The references are not intended to be restrictive, and bids are invited on these and comparable brands or products of any manufacturer. Responders must include alternate brand specifications for purposes of comparison to approved brands based on the same or higher level of performance. Contract Award It is the intent of the Iowa DOT to award the contract to the responsible bidder whose submitted quotation is the most advantageous to the Iowa DOT, cost and other factors considered. Other factors include, but are not limited to: meeting or exceeding mandatory requirements, proposed staffing, and meeting required time schedule. Award will be made for any one group or combination of groups. All items within a group must be bid to be considered for a group award, but other factors will be considered. Contract Begin Date Contract to begin on December 1, 2022 Contract End Date Contract to end on August 31, 2023. Contract Award The Contractor will be awarded a nine (9) month contract with an option to renew for five (5) additional years in twelve (12) month increments. Contract Quantities Quantities listed are estimates only. Actual purchases may vary considerably based on actual needs throughout the contract period. IADOT - Maintenance and Repair of Iowa DOT Fuel Tank Systems in Districts 1, 2 and 5

Award

Water / Sewer

$33,470.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
43
Bidding Soon
475
All Active Projects
262
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 28, 2022

December 1, 2022

img_map_placeholder

931 S 4th St, Ames, IA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.