Site work for a water / sewer project in Sulphur, Oklahoma. Completed plans call for site work for a water / sewer project.

Station 499+50 to 520+24.62 Rt 1574 L.F. 8 PVC C900 DR18 Waterline 2 EA. 8 Interconnection 2 EA. 8 Gate Valve & Box 2 EA. 8x90Bend 1 EA. 8x22.5 Bend 3 EA. 8x11.25Bend 500 L.F. Directional Bore & Install 8PE SDR11 4 EA. PVC to PE Transition 2 EA. Air/Vac Release Valve 16 S.Y.Gravel Repair 1 EA. 8 Cut & Plug 1 L.S. Hydrostatic Pressure Testing and Disinfection 1 L.S. Erosion Control 1 L.S. Construction Traffic Control Sta. 499+94.39 2 Waterline crossing 120 L.F. 2" PVC CL200 Waterline 2 EA. 2 Interconnection 2 EA. 2x90 Bend 1 EA. 2 Gate Valve & Box 2 EA. 2x45 Bend 75 L.F. Bore & Install 4 Stl. Casing, 0.25 Thk. 2 EA. 2 Sch. 40 Stl. Vent Pipe Station 501+90.17 to 585+50 - 4" PVC Class 200 Water Main Directional Bore & Install 4" PE SDR 11 Waterline 2" PVC Class 200 Waterline 1" PE SDR 9 Service Line Bore & Install 8" STL. Casing (0.188" Thick) Bore & Install 6" STL. Casing (0.25" Thick) Bore & Install 2.5" STL. Casing (0.25" Thick) Rock Trenching Trenching 2" Interconnection 4" Slick Bore for PVC 4" x 11.25 Bend 4" Gate Valve & Box 4" x 2" Tee 6" Interconnection 6" x 90 Bend 6" x 4" Reducer 2" Gate Valve & Box 2" x 90 Bend . 2" Schedule 40 Steel Vent Pipe 1" Air Release Valve PVC to PE Transition Blow- off Assembly Gravel Repair Short Service Long Service Embedment Material Sta. 605+00 crossing 8" PVC CL200 Water Main Bore & Install 14"STL Casing (0.25" Thick) Rock Trenching 8" Interconnection 8" Gate Valve & Box 8" x 45 Bend 2" Schedule 40 Steel Vent Pipe Embedment Material Pressure Test & Disinfect Construction Traffic Control Erosion Control A certified check, cashiers check or bid bond equal to 5 percent (5%) of the total amount bid shall be attached to all bids as a guarantee that the successful bidder will, within ten (10) days of the date of notice of award, enter into contract and file the required bonds. No bidder may withdraw his bid within 45 days after the actual date of the opening thereof. Checks of unsuccessful bidders shall be returned to them in accordance with the terms of the bid solicitation. Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the office designated in the solicitation by the time specified in herein. Any proposal, modification, or revision received at the office designated in the solicitation after the exact time specified for receipt of offers is late and will not be considered The Owner reserves the right to reject any or all bids, waive any irregularities or technicalities without assigning any reason therefore, and to make the awards in the best interest of the Owner Completion- 120 consecutive calendar days Project No- J3-0428(004)

Award

Water / Sewer

$247,900.00

Public - City

Site Work

91

18

4

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Loading Dock Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Dewatering, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Tunneling and Mining, Shaft Construction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Watering, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Plugging, Seeding, Sodding, Sprigging, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
37
Bidding Soon
465
All Active Projects
209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2022

January 11, 2023

img_map_placeholder

State Hwy 7, Sulphur, OK

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

ODOT Water Line Relocation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.