Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Sulphur, Oklahoma. Completed plans call for site work for a water / sewer project.
Station 499+50 to 520+24.62 Rt 1574 L.F. 8 PVC C900 DR18 Waterline 2 EA. 8 Interconnection 2 EA. 8 Gate Valve & Box 2 EA. 8x90Bend 1 EA. 8x22.5 Bend 3 EA. 8x11.25Bend 500 L.F. Directional Bore & Install 8PE SDR11 4 EA. PVC to PE Transition 2 EA. Air/Vac Release Valve 16 S.Y.Gravel Repair 1 EA. 8 Cut & Plug 1 L.S. Hydrostatic Pressure Testing and Disinfection 1 L.S. Erosion Control 1 L.S. Construction Traffic Control Sta. 499+94.39 2 Waterline crossing 120 L.F. 2" PVC CL200 Waterline 2 EA. 2 Interconnection 2 EA. 2x90 Bend 1 EA. 2 Gate Valve & Box 2 EA. 2x45 Bend 75 L.F. Bore & Install 4 Stl. Casing, 0.25 Thk. 2 EA. 2 Sch. 40 Stl. Vent Pipe Station 501+90.17 to 585+50 - 4" PVC Class 200 Water Main Directional Bore & Install 4" PE SDR 11 Waterline 2" PVC Class 200 Waterline 1" PE SDR 9 Service Line Bore & Install 8" STL. Casing (0.188" Thick) Bore & Install 6" STL. Casing (0.25" Thick) Bore & Install 2.5" STL. Casing (0.25" Thick) Rock Trenching Trenching 2" Interconnection 4" Slick Bore for PVC 4" x 11.25 Bend 4" Gate Valve & Box 4" x 2" Tee 6" Interconnection 6" x 90 Bend 6" x 4" Reducer 2" Gate Valve & Box 2" x 90 Bend . 2" Schedule 40 Steel Vent Pipe 1" Air Release Valve PVC to PE Transition Blow- off Assembly Gravel Repair Short Service Long Service Embedment Material Sta. 605+00 crossing 8" PVC CL200 Water Main Bore & Install 14"STL Casing (0.25" Thick) Rock Trenching 8" Interconnection 8" Gate Valve & Box 8" x 45 Bend 2" Schedule 40 Steel Vent Pipe Embedment Material Pressure Test & Disinfect Construction Traffic Control Erosion Control A certified check, cashiers check or bid bond equal to 5 percent (5%) of the total amount bid shall be attached to all bids as a guarantee that the successful bidder will, within ten (10) days of the date of notice of award, enter into contract and file the required bonds. No bidder may withdraw his bid within 45 days after the actual date of the opening thereof. Checks of unsuccessful bidders shall be returned to them in accordance with the terms of the bid solicitation. Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the office designated in the solicitation by the time specified in herein. Any proposal, modification, or revision received at the office designated in the solicitation after the exact time specified for receipt of offers is late and will not be considered The Owner reserves the right to reject any or all bids, waive any irregularities or technicalities without assigning any reason therefore, and to make the awards in the best interest of the Owner Completion- 120 consecutive calendar days Project No- J3-0428(004)
Award
Water / Sewer
$247,900.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 12, 2022
January 11, 2023
State Hwy 7, Sulphur, OK
Related To This Project
Sulphur, OK
Bid Date: Feb 10 2023
Sulphur, OK
Bid Date: Dec 12 2022
Sulphur, OK
--
Sulphur, OK
Bid Date: Mar 17 2022
Sulphur, OK
Bid Date: Mar 21 2022
Sulphur, OK
Bid Date: Mar 21 2022
Sulphur, OK
Bid Date: Jan 06 2022
Sulphur, OK
Bid Date: Jun 13 2022
Sulphur, OK
Bid Date: Nov 30 2022
Sulphur, OK
Bid Date: Nov 10 2022
Sulphur, OK
Bid Date: Sep 15 2022
Sulphur, OK
Bid Date: Sep 30 2022
Sulphur, OK
Bid Date: Sep 30 2022
Sulphur, OK
Bid Date: Sep 30 2022
Ada, OK
Bid Date: Dec 19 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.