BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 3, 2026 at 8:00 PM

Updated June 10, 2026

Site work, paving and new construction of a mixed-use development in Milwaukee, Wisconsin. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the construction of a bridge / tunnel; multi-residential development; and office development.

Proposed plans to reconstruct the I-794 Lake Interchange corridor in downtown Milwaukee. As of June 3, 2026, this project is in planning phase. An Alternative Development and Analysis is in progress. The department is currently deciding between leaving the freeway, replacing portions of it, removing it, or improving it. A decision should be made in 2027. Construction would potentially start in 2030.

Conceptual

Multi-Residential

$300,000,000.00

Public - City

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
312
Active Projects
179
Bidding Soon
3,264
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2030

Project location map

I-794, Milwaukee, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.