BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Wahpeton, North Dakota. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Proposed project to connect the Wheatland Road Shared Use Path from 11th Street to 4th Street and eventually Kidder Road. The shared use path would be a 10 ' wide path with 4" of bituminous pavement, and 6" of aggregate. Three options were considered for routing the path. Each option has advantages and disadvantages. Unit costs for the project are estimated at $216 per lineal foot of path, approximately five percent over the Wheatland Road Shared Use Path Cost. Proposed project is compatible with the TAP Grant Program. Below is a description of the three options. Option A proposed route includes extending straight east to 9th Street North. Path to extend south on the west side of 9th Street North. Path would extend east to 4th Street on back side of properties bordering 18th Avenue North. This route has the most advantages. There is existing City ROW between Cenex and Colonial Rental Property. The disadvantage of this route is the pathway crosses the trunk watermain and 21 inch force main. Pathway length is 2,991 lineal feet. Estimated cost is $646,056. Option B proposed route includes new path straight east from 11th Street to back side of Colonial Rental Property, path would then extend south to the mobile home park property and continue east to 9th Street North. The next segment of pathway would extend east to 4th Street on backside of properties bordering 18th Avenue North. The advantage of this option is the route doesn't cover as much of the watermain and force main adjacent to 9th Street North. The disadvantage of this option is it does not provide the most direct route to 4th Street North. Pathway length is 3,169 lineal feet. Estimated cost is $684,504 Option C proposed route includes new path straight east from 11th Street to 9th Street. At 9th Street pathway would continue east between Armory Property and WCCO Property to 4th Street North. This is the most direct route. The disadvantage of this route is the pathway route abuts the WCCO Belting Building. Pathway length is 2,490 lineal feet. Estimated cost is $537,840 All options require an easement from WCCO Belting to extend pathway on their property. Options A and B require an easement from Ottertail Power. Option C would require an easement from Interstate Engineering. This project is in included in the City of Wahpeton FY 2023-2027 Capital Improvement Plan (CIP). As of November 4, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$646,056.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
12
Bidding Soon
104
All Active Projects
47
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2024

img_map_placeholder

Multiple Locations, Wahpeton, ND

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.