BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 20, 2022 at 7:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Hallandale Beach, Florida. Completed plans call for site work for a water / sewer project.

This section summarizes the Work of the Project as covered in detail in the complete Contract Documents. This is a general summary and is not intended to be complete and all inclusive of the required Work items. The project scope includes construction of new storm drainage facilities to improve flooding nuisance. In addition, it includes pavement restoration and pavement markings, regrading and sodding of swales as necessary, sidewalk replacement, new ADA ramps as required, removal and replacement of vegetation, waterline relocation, and other miscellaneous improvements. The City reserves the right to occupy and to place and install equipment in areas of the Project, prior to Substantial Completion provided that such occupancy does not interfere with completion of the Work. Such placing of equipment and partial occupancy shall not constitute acceptance of the Work. The CONTRACTOR will coordinate its work with utility companies, landowners and City activities, with specific attention to access and staging areas. Construction sequence shall be determined by Contractor subject to the following needs for continuous access and operation by others. The contractor shall protect the work areas and close lanes as necessary providing proper signage and protections, while other parts of the roadways are being used. Contractor shall coordinate access to neighbors to their driveways. Contractor may suggest modificationsto the sequence provided the access and operation requirements are satisfied and compliance with the overall contract period is achieved. Schedule the Work to conform to the following events and dates, and to provide for coordination with the work performed by others. No events are scheduled. Question date - 11/28/2022 at 11:00 AM ET 220421061

Post-Bid

Water / Sewer

$975,600.00

Public - City

Site Work

18

12

2

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
268
Active Projects
131
Bidding Soon
1,744
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2022

March 1, 2023

Project location map

NE 3rd St, Hallandale Beach, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.