BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in West Lafayette, Indiana. Completed plans call for the renovation of a educational facility.

1. West Lafayette Campus - Beering Hall Fire Alarm System Replacement - 2022 2. West Lafayette Campus - Black Cultural Center Cooling System Rehabilitation - 2022 3. West Lafayette Campus - Combustion Research Lab AC1-1 and AC1-5 Refrigeration Systems Replacement - 2022 4. West Lafayette Campus - Hansen Hall Germ Free Expansion Space Renovation - 2022 5. West Lafayette Campus - Herrick Acoustics Lab ACA-1 Replacement - 2022 6. West Lafayette Campus - Lilly Hall Rooms 2130 and 2131 Renovation - 2022 7. West Lafayette Campus - Stone Hall Masonry Restoration - 2022 8. West Lafayette Campus - Various Roads Patch, Repair, and Rehabilitation - 2022 9. West Lafayette Campus - Whistler Hall Room S007 and S049 Growth Chamber Room Renovations - 2022 10. West Lafayette Campus - Wildlife Ecology Research Facility Emergency Generator Installation - 2022 Bids may be withdrawn prior to such time, but no bids shall be withdrawn for a period of sixty (60) days thereafter. The Board of Trustees of The Trustees of Purdue University reserves the right to reject any and all bids and to waive, to the extent permitted by law, any of the terms, conditions and provisions contained in this Advertisement for Bids or the Instructions to Bidders or any informality, irregularity or omission in any bid, provided that such waiver shall, in the discretion of the Board of Trustees, be to the advantage of The Trustees of Purdue University. A. Complete replacement of the existing fire alarm system with a new fully addressable fire alarm system at Beering Hall on the Purdue University West Lafayette campus. The new system will include fire door holders, initiating devices, signaling devices, manual devices, automatic devices (smoke/heat detectors), annunciation system, elevator interconnections, interconnection and monitoring of high rise smoke control system, control and annunciator panels as recommended or mandated by local and state building codes, NFPA 72, and Purde University. Existing fire alarm system will be taken down prior to installation of new system, temporary sprinkler monitoring and building safety coordination to be completed by contractor. B. Contract: Construction work under unified fixed price contract

Post-Bid

Educational

$547,850.00

Public - State/Provincial

Renovation

33

14

9

7

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
76
Bidding Soon
734
All Active Projects
382
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2022

September 1, 2023

img_map_placeholder

100 N University St, West Lafayette, IN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.