Site work and paving for a civil project in Oakland, California. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; water / sewer project; and development.

The proposed work consists, in general, of seismic retrofit of Leimert Boulevard Bridge over Sausal Creek, including wrapping of concrete members with Carbon Fiber Reinforced Polymer (CFRP), treating bridge deck with methacrylate and overlaying with polyester concrete, graffiti removal, structure (excavation & backfill), spall repair, replacing portion of railing chain, replacing utility supports, slope pavement, replace joint seals, fencing, roadway excavation, vegetation replanting, environmental protection, traffic control system, and other items shown on plans and Special Provisions. Locations- From CA-12 West/1-80 West take Exit 40 for 1-680 toward Benicia/San Jose and continue straight on 1-680 South for approximately 24 miles. Take exit 46 for CA-24 toward Lafayette/Oakland and continue on CA-24 West for approximately eight miles. Keep lefi at the fork to stay on CA-24 West for approximately two miles before taking the Exit 5A for Hayward toward CA-13 South. Continue onto CA-13 South for approximately two miles to take Exit 3 toward Park Boulevard. Take Park Boulevard and merge onto Trafalgar Place. In approximately 230 feet, turn right onto Park Boulevard, and then in approximately one mile, turn left onto Leimert Boulevard. The destination is the Leimert Boulevard Bridge spanning over Dimond Canyon Park. Question Deadline 03/16/2023 at 2:00 PM PT M by email to the DOT Project Manager. It is the Consultant responsibility to ensure that the email has been received. Questions Due: January 3, 2023, by 2:00 PM. by email to the Project Manager. It is the Contractor's responsibility to ensure that the email is received by the Project Manager. Any addendum that materially changes the bid invitation shall be issued no less than 72 hours before the bid opening, unless the bid opening is extended by said addendum. Contract Days: 1460 working days Construction shall be completed within 257 working days from Notice to Proceed. Plant Maintenance and Monitoring shall start after project final acceptance and continue for 1203 working day Liquidated Damages: 4,800 per calendar day Bonds: 10% Bid Security; 100% Payment and Performance Bonds DBE Goal: 18.0%. Local business preference programs are not applied on federally funded projects. Prime contractors are advised to verify the DBE certifications status of any subcontractor prior to submittal Federal Trainees Required: 0 Local Trucking Requirement: No Self-Performance: 30% minimum, excluding Specialty Items if any per the Bid Schedule. DOT Project Manager: Mustafa Humran at 510-238-2654, mhumran@oaklandca.gov Capital Contracts: Capital Contracts, capitalcontracts@oaklandca.gov Contract Compliance Officer: Vivian Inman at vinman@oaklandca.gov or (510) 238-6261 Engineer's Estimate: $4,568,946 MBE (25.6%), WBE (6.9%), DBE (18%)

Post-Bid

Bridges / Tunnels

$243,797.00

Public - City

Paving, Site Work

Subscribe For Documents

77 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 08 - Openings

Division 08 - Openings

Windows
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Art, Multiple Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Instrumentation and Control for Electrical Systems, Central Dimming Controls, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Timber Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Retaining Walls, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
135
Bidding Soon
2,123
All Active Projects
889
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2023

May 10, 2023

img_map_placeholder

Leimert Blvd, Oakland, CA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Construction of the Seismic Retrofit of Leimert Boulevard Bridge Over Sausal Creek Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.